Design Analysis Configuration and Capacity of Off-Grid with Implementation of Photovoltaic (PV) and Battery Energy Storage System (BESS) as Power Supply for Shipping Activities at Ports

Fiqi Mutiah, B. Sudiarto
{"title":"Design Analysis Configuration and Capacity of Off-Grid with Implementation of Photovoltaic (PV) and Battery Energy Storage System (BESS) as Power Supply for Shipping Activities at Ports","authors":"Fiqi Mutiah, B. Sudiarto","doi":"10.24036/jptk.v6i1.31623","DOIUrl":null,"url":null,"abstract":"The government of Indonesia developing mitigation for climate change and achieving decarbonization in the sea transportation sector by encouraging increased use of onshore power supply for ships when berthing at ports. Off-Grid is one of the green transition technologies that provide great benefits to ports for the mitigation of environmental. To ensure optimal system operation, determining the proper configuration and component sizes is an important decision at the design stage. One of the important activities at the port is the transportation of mining products, B3 waste, and others by using ships operated with diesel engines which are known to be expensive and not environmentally friendly. The configuration consists of a photovoltaic system and an energy storage system as well as land electricity support at the port then optimized by considering solar radiation, temperature, and data component specifications to supply power to the ship so that do not use diesel generators on board. From the calculation results it is known that when the ship is anchored it requires 3,310.34 kWh/day of electrical energy. To meet electricity needs, 3,200 units of PV modules are designed with a power output of 1,216 kW peak and a BESS capacity of 4,064 kWh.","PeriodicalId":55675,"journal":{"name":"Jurnal Pendidikan Teknologi dan Kejuruan","volume":"61 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-02-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Pendidikan Teknologi dan Kejuruan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24036/jptk.v6i1.31623","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The government of Indonesia developing mitigation for climate change and achieving decarbonization in the sea transportation sector by encouraging increased use of onshore power supply for ships when berthing at ports. Off-Grid is one of the green transition technologies that provide great benefits to ports for the mitigation of environmental. To ensure optimal system operation, determining the proper configuration and component sizes is an important decision at the design stage. One of the important activities at the port is the transportation of mining products, B3 waste, and others by using ships operated with diesel engines which are known to be expensive and not environmentally friendly. The configuration consists of a photovoltaic system and an energy storage system as well as land electricity support at the port then optimized by considering solar radiation, temperature, and data component specifications to supply power to the ship so that do not use diesel generators on board. From the calculation results it is known that when the ship is anchored it requires 3,310.34 kWh/day of electrical energy. To meet electricity needs, 3,200 units of PV modules are designed with a power output of 1,216 kW peak and a BESS capacity of 4,064 kWh.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
实施光伏和电池储能系统(BESS)作为港口航运活动电源的离网设计分析、配置和容量
印度尼西亚政府通过鼓励船舶在港口停泊时更多地使用陆上电力供应,发展减缓气候变化的措施,并在海上运输部门实现脱碳。离网技术是一种绿色转型技术,为港口缓解环境污染提供了巨大的效益。为了确保系统的最佳运行,确定适当的配置和组件尺寸是设计阶段的重要决策。该港口的一项重要活动是使用柴油发动机的船只运输矿产品、B3废物和其他产品,众所周知,柴油发动机价格昂贵且不环保。该配置包括一个光伏系统和一个储能系统,以及港口的陆地电力支持,然后通过考虑太阳辐射、温度和数据组件规格进行优化,为船舶供电,因此船上不使用柴油发电机。从计算结果可知,船舶停泊时需要3310.34千瓦时/天的电能。为满足电力需求,设计了3200台光伏组件,峰值输出功率为1216千瓦,BESS容量为4064千瓦时。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
20
审稿时长
24 weeks
期刊最新文献
Evaluation of the program for modeling and implementation of a virtual laboratory for solid-state electronics The effect of peer lesson strategy on learning outcomes of building construction and land measurement techniques Penerapan Problem Based Learning dengan Menerapkan Teknik Windows Shopping untuk Meningkatkan Motivasi Belajar Peningkatan Partisipasi dan Penguasaan Vocabulary Siswa Kelas VII A SMP 1 Kabat Menggunakan Media Flashcard Pengelompokan Gaya Belajar Secara Homogen dalam Mendukung Pembelajaran Diferensiasi Proses Siswa
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1