NASA-TLX Assessment of Mental Workload in Manufacturing Industry

Muhammad Saddam Akbar Hermansyah, N. Handayani
{"title":"NASA-TLX Assessment of Mental Workload in Manufacturing Industry","authors":"Muhammad Saddam Akbar Hermansyah, N. Handayani","doi":"10.12928/si.v20i2.43","DOIUrl":null,"url":null,"abstract":"Mental workload assessment is essential for the optimal interaction of human system in the manufacturing industry. Manufacturing industry engaged in the construction, maintenance, and fabrication service. Performance of the worker will be lower if the higher workload. In the manufacturing industry are two type of workers that mainly involved in the fabrication process such as operator and welder. In This process was found several defects in the finished good which caused the company to suffer losses. Fatigue due to overtime work for seven days and a high mental workload. The aim of this study was to measure the mental workload in the manufacturing industry. In This study was performed on 10 worker in the operator and welder. Mental workload were assessed using NASA Task Load Index (NASA-TLX) and Fault Tree Analysis (FTA) tools. One operator workers and one of welders belonged to the heavy workload category. Finally, NASA-TLX was significantly higher for operator and welder. High mental workload in the manufacturing industry indicated the defection on mental workload. It is recommended to fixes are evaluating and updating rule work, system work, and existing SOP","PeriodicalId":32235,"journal":{"name":"Spektrum Industri Jurnal Ilmiah Pengetahuan dan Penerapan Teknik Industri","volume":"11 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-10-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Spektrum Industri Jurnal Ilmiah Pengetahuan dan Penerapan Teknik Industri","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.12928/si.v20i2.43","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Mental workload assessment is essential for the optimal interaction of human system in the manufacturing industry. Manufacturing industry engaged in the construction, maintenance, and fabrication service. Performance of the worker will be lower if the higher workload. In the manufacturing industry are two type of workers that mainly involved in the fabrication process such as operator and welder. In This process was found several defects in the finished good which caused the company to suffer losses. Fatigue due to overtime work for seven days and a high mental workload. The aim of this study was to measure the mental workload in the manufacturing industry. In This study was performed on 10 worker in the operator and welder. Mental workload were assessed using NASA Task Load Index (NASA-TLX) and Fault Tree Analysis (FTA) tools. One operator workers and one of welders belonged to the heavy workload category. Finally, NASA-TLX was significantly higher for operator and welder. High mental workload in the manufacturing industry indicated the defection on mental workload. It is recommended to fixes are evaluating and updating rule work, system work, and existing SOP
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
NASA-TLX对制造业脑力负荷的评估
心理工作量评估是制造业人力系统优化互动的必要条件。制造业从事建筑、维修、制造服务。工作量越大,工作效率越低。在制造业中,主要参与制造过程的工人有两种,即操作员和焊工。在这个过程中发现了成品的几个缺陷,给公司造成了损失。加班7天的疲劳和高的精神负荷。本研究的目的是测量制造业的脑力负荷。在这项研究中,对10名工人进行了操作和焊工。采用NASA任务负荷指数(NASA- tlx)和故障树分析(FTA)工具评估心理负荷。1名操作工人和1名焊工属于工作量大的类别。最后,对于操作人员和焊工来说,NASA-TLX明显更高。制造业的高脑力负荷反映了脑力负荷的缺陷。建议对规则工作、系统工作和现有SOP进行评估和更新
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
12 weeks
期刊最新文献
Relationship between Demographic and Employment Parameters with Job Stress Among Employees of an Oil Field in Western Iran Monitoring Viscosity of Polymer Products on the Reactor Tank Using IoT-based NodeMCU Risk Management Framework Design Based on ISO 31000 and SCOR Model Risk and Reliability Improvement Analysis of Boiler System Using the Failure Mode Effect Analysis & Critical Analysis (FMECA) Method Market and Industrialization Opportunities of Rumah Unggul Sistem Panel Instan (RUSPIN) Technology Using Business Model Canvas
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1