An Electrifying Integrated Solution Towards a Safe and Environmentally Sound Well Abandonment in Urban Setting

Syahnon Mohamad, L. Joppe
{"title":"An Electrifying Integrated Solution Towards a Safe and Environmentally Sound Well Abandonment in Urban Setting","authors":"Syahnon Mohamad, L. Joppe","doi":"10.4043/31394-ms","DOIUrl":null,"url":null,"abstract":"\n In the Netherlands, a large number of onshore wells are near urban areas or close to forests where environmental emission and noise reduction are important to consider. With more than 23 different well site locations to be abandoned, a significant amount of collaboration is required to ensure there is minimal interruption and impact to the local community and the environment.\n To achieve this, the operator together with Baker Hughes as the project management lead, formulated a unique, low-impact solution with fully electrified equipment that mostly uses grid power. Alongside other service partners, the majority of the onsite equipment are electrically driven, such as the rigless well abandonment unit, cement pumps, ancillary equipment, and the slickline unit. A noise dampener and decibel readers were put in place to minimize and track sound emissions.\n Such collaboration and integration with all providers were carefully identified and mitigated through a series of non-technical risks (NTRs) to ensure compliance with local regulations. Extra steps were taken to ensure that smell and noise remain unnoticed by the surrounding environment. Frequent communications are sent to the public by the operator to keep everyone informed prior to any mobilization.\n After a one-year campaign, there have been zero LTI, zero accidents, zero non-compliance incidents and above all, safe and secured end-of-life oil wells in an urban setting with many more to follow suit.\n This paper will provide insight into the integrated operations of a well abandonment project in a unique urban setting and the challenges to successfully abandon wells of varying complexity. This project is to be accomplished in compliance with the local mining and environmental regulations with no remaining liabilities, all while limiting total project costs. The supply chain stepped up by providing a cost-effective solution through multi-party collaboration, multi-skilling, technology innovation, and logistical solutions. The project planning, start-up phase, and an overview of the first year of operations will be presented.","PeriodicalId":11011,"journal":{"name":"Day 3 Thu, March 24, 2022","volume":"87 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-03-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Thu, March 24, 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4043/31394-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In the Netherlands, a large number of onshore wells are near urban areas or close to forests where environmental emission and noise reduction are important to consider. With more than 23 different well site locations to be abandoned, a significant amount of collaboration is required to ensure there is minimal interruption and impact to the local community and the environment. To achieve this, the operator together with Baker Hughes as the project management lead, formulated a unique, low-impact solution with fully electrified equipment that mostly uses grid power. Alongside other service partners, the majority of the onsite equipment are electrically driven, such as the rigless well abandonment unit, cement pumps, ancillary equipment, and the slickline unit. A noise dampener and decibel readers were put in place to minimize and track sound emissions. Such collaboration and integration with all providers were carefully identified and mitigated through a series of non-technical risks (NTRs) to ensure compliance with local regulations. Extra steps were taken to ensure that smell and noise remain unnoticed by the surrounding environment. Frequent communications are sent to the public by the operator to keep everyone informed prior to any mobilization. After a one-year campaign, there have been zero LTI, zero accidents, zero non-compliance incidents and above all, safe and secured end-of-life oil wells in an urban setting with many more to follow suit. This paper will provide insight into the integrated operations of a well abandonment project in a unique urban setting and the challenges to successfully abandon wells of varying complexity. This project is to be accomplished in compliance with the local mining and environmental regulations with no remaining liabilities, all while limiting total project costs. The supply chain stepped up by providing a cost-effective solution through multi-party collaboration, multi-skilling, technology innovation, and logistical solutions. The project planning, start-up phase, and an overview of the first year of operations will be presented.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
一种安全环保的城市弃井电气化综合解决方案
在荷兰,大量的陆上井位于城市附近或森林附近,这些地方的环境排放和噪音降低是重要的考虑因素。由于有超过23个不同的井位将被废弃,因此需要进行大量的合作,以确保对当地社区和环境的影响最小化。为了实现这一目标,作业者与项目管理负责人贝克休斯共同制定了一种独特的低影响解决方案,该解决方案采用全电气化设备,主要使用电网供电。与其他服务伙伴一样,大部分现场设备都是电动的,例如无钻机弃井装置、水泥泵、辅助设备和钢丝绳装置。安装了噪音减震器和分贝读数器,以最大限度地减少和跟踪声音排放。通过一系列非技术风险(ntr),仔细识别并减轻了与所有供应商的这种协作和集成,以确保遵守当地法规。采取了额外的措施,以确保周围环境不会注意到气味和噪音。运营商经常向公众发送通信,以便在任何动员之前让每个人都了解情况。经过一年的活动,没有LTI,没有事故,没有违规事件,最重要的是,在城市环境中安全可靠的报废油井,还有更多的人效仿。本文将深入了解在独特的城市环境中弃井项目的综合作业,以及成功弃井所面临的挑战。该项目将在遵守当地采矿和环境法规的情况下完成,没有剩余的负债,同时限制项目总成本。通过多方协作、多技能、技术创新和物流解决方案,提供具有成本效益的解决方案,加快了供应链的步伐。将介绍项目规划、启动阶段和第一年业务的概述。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Integrated Advance Petrophysical Evaluation for Heterolithic Clastics Reservoir Characterization Optimization in Malay Basin The Transformation Journey and Key Critical Success Factors of Turbomachinery Digital Remote Monitoring Biggest Wells Plug and Abandonment Campaign – Effective Management & Best Practices Implementation Zawtika Deferment Management Enhancement: A Systematic Way to Unlock Gas Potential for Optimized Operations Breakthrough Integration of 3-1/2? Tubing in 8-1/2? Hole Cemented Monobore for Successful Tubing Stem Test TST
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1