{"title":"Side abutment pressure distribution by field measurement","authors":"Lian-guo WANG ,&nbsp;Yang SONG ,&nbsp;Xing-hua HE ,&nbsp;Jian ZHANG","doi":"10.1016/S1006-1266(08)60288-6","DOIUrl":null,"url":null,"abstract":"<div><p>Given the 7<sub>1</sub>23 working face in the Qidong Coal Mine of the Wanbei Mining Group, nine dynamic roof monitors were installed in the crossheading to measure the amount and velocity of roof convergence in different positions and at different times and three steel bored stress sensors were installed in the return airway to measure rock stress at depth. On the basis of this arrangement, the rule of change of the distribution of the side abutment pressure with the advance of the working face and movement of overlying strata was studied. The rule of change and the stability of rock stress at depth were measured. Secondly, the affected area and stability time of the side abutment pressure were also studied. The results show that: 1) During working, the face advanced distance was from 157 m to 99 m, the process was not effected by mining induced pressure. When the distance was 82 m, the position of peak stress was 5 m away from the coal wall. When the distance was 37 m, the position of peak stress away from the coal wall was about 15 m to 20 m and finally reached a steady state; 2) the time and the range of the peak of side rock pressure obtained from stress sensors were consistent with the results from the dynamic roof monitors; 3) the position of the peak pressure was 25 m away from the coal wall.</p></div>","PeriodicalId":15315,"journal":{"name":"Journal of China University of Mining and Technology","volume":"18 4","pages":"Pages 527-530"},"PeriodicalIF":0.0000,"publicationDate":"2008-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/S1006-1266(08)60288-6","citationCount":"10","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of China University of Mining and Technology","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S1006126608602886","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"2008/12/21 0:00:00","PubModel":"Epub","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 10

Abstract

Given the 7123 working face in the Qidong Coal Mine of the Wanbei Mining Group, nine dynamic roof monitors were installed in the crossheading to measure the amount and velocity of roof convergence in different positions and at different times and three steel bored stress sensors were installed in the return airway to measure rock stress at depth. On the basis of this arrangement, the rule of change of the distribution of the side abutment pressure with the advance of the working face and movement of overlying strata was studied. The rule of change and the stability of rock stress at depth were measured. Secondly, the affected area and stability time of the side abutment pressure were also studied. The results show that: 1) During working, the face advanced distance was from 157 m to 99 m, the process was not effected by mining induced pressure. When the distance was 82 m, the position of peak stress was 5 m away from the coal wall. When the distance was 37 m, the position of peak stress away from the coal wall was about 15 m to 20 m and finally reached a steady state; 2) the time and the range of the peak of side rock pressure obtained from stress sensors were consistent with the results from the dynamic roof monitors; 3) the position of the peak pressure was 25 m away from the coal wall.

查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
现场测得侧支台压力分布
以皖北矿业集团祁东煤矿7123工作面为例,在巷道中安装了9台动态顶板监测器,用于测量顶板在不同位置、不同时间的收敛量和收敛速度,在回采巷道中安装了3台钢钻孔应力传感器,用于测量深部岩石应力。在此基础上,研究了侧支承压力分布随工作面推进和上覆岩层移动的变化规律。测量了深部岩石应力的变化规律和稳定性。其次,研究了侧支台压力的影响范围和稳定时间。结果表明:1)在工作过程中,工作面推进距离为157 m ~ 99 m,未受采动压力影响;当距离为82 m时,应力峰值位置在距煤壁5 m处。当距离为37 m时,峰值应力距离煤壁约为15 ~ 20 m,最终达到稳定状态;2)应力传感器测得的侧岩压力峰值出现的时间和范围与动态顶板监测结果一致;3)峰值压力位置在距煤壁25 m处。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Prospecting for coal in China with remote sensing Effect of pre-tensioned Rock Bolts on Stress Redistribution Around a Roadway-Insight from Numerical Modeling Degradation of microcystin-RR in water by chlorine dioxide Comprehensive analysis of slope stability and determination of stable slopes in the Chador-Malu iron ore mine using numerical and limit equilibrium methods Theory and technology of preventing water from flooding roadways
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1