Analisis Line Balancing pada Proses Produksi Style Order Long Pants

S. Sugiyarto, Bambang Yulianto, Silvia Septi Mirnawati
{"title":"Analisis Line Balancing pada Proses Produksi Style Order Long Pants","authors":"S. Sugiyarto, Bambang Yulianto, Silvia Septi Mirnawati","doi":"10.59432/jute.v4i1.1","DOIUrl":null,"url":null,"abstract":"Line balancing is an assignment of a number of jobs into interconnected work stations in one production line. PT PB Tbk. is a company engaged in garment industry  producing apparel. One of the  products is long pants, there are 137 work elements which are divided into 4 work stations, where each work element consists of 1 operator. During production process, unbalance workload problems often occur such as a lot of idle time for some operatorsand overload for other operators. Based on this issue, it is necessary to recalculate the number of work stations and distribute the workload to avoid excessive idle time so that work can be more effective and efficient. One way to overcome this problem is applying line balancing method, with the aim that implementation of this line  balancing method may  achieve  optimal results and each work station works effectively and has maximum work efficiency. The results of this study showed that there were additional work stations from 4 to 57, however there were adjustments to the workload. \nKeywords: line balancing, work station, bottleneck, work elements, efficiency","PeriodicalId":32404,"journal":{"name":"Jema Jurnal Ilmiah Bidang Akuntansi dan Manajemen","volume":"73 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jema Jurnal Ilmiah Bidang Akuntansi dan Manajemen","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.59432/jute.v4i1.1","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Line balancing is an assignment of a number of jobs into interconnected work stations in one production line. PT PB Tbk. is a company engaged in garment industry  producing apparel. One of the  products is long pants, there are 137 work elements which are divided into 4 work stations, where each work element consists of 1 operator. During production process, unbalance workload problems often occur such as a lot of idle time for some operatorsand overload for other operators. Based on this issue, it is necessary to recalculate the number of work stations and distribute the workload to avoid excessive idle time so that work can be more effective and efficient. One way to overcome this problem is applying line balancing method, with the aim that implementation of this line  balancing method may  achieve  optimal results and each work station works effectively and has maximum work efficiency. The results of this study showed that there were additional work stations from 4 to 57, however there were adjustments to the workload. Keywords: line balancing, work station, bottleneck, work elements, efficiency
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
分析线路平衡模式处理产品样式订单长裤
生产线平衡是指将若干工作分配到一条生产线上相互连接的工作站。PT PB Tbk。是一家从事服装行业生产服装的公司。其中一种产品是长裤,共有137个工位,分为4个工位,每个工位由1名操作员组成。在生产过程中,经常会出现一些作业者空闲时间过多,而另一些作业者超负荷等工作量不平衡问题。基于这个问题,有必要重新计算工位的数量,分配工作量,避免过多的闲置时间,使工作更加有效和高效。解决这一问题的一种方法是采用线路平衡法,使线路平衡法的实施达到最优效果,使各工位工作有效,工作效率达到最大。这项研究的结果表明,增加了4至57个工作站,但工作量有所调整。关键词:线路平衡,工作站,瓶颈,工作要素,效率
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
3
审稿时长
4 weeks
期刊最新文献
Pengaruh Jumlah Lilitan Roving pada Flyer terhadap Kerataan Roving dan Kekuatan Benang yang Dihasilkan Analisis Pemilihan Parameter Desain bagian Top plate Lemari CKD dengan Metode Fenite Elemen Analisis Proses Pembuatan Produk Kemeja Lengan Pendek Analisis Penggantian dan Perawatan pada Papermachine Bagian Wire dan Dryer Menggunakan Metode Reliability Centered Maintenance dan Age replacement Pada PT. X Efisiensi pada Mesin Shuttle 75” SGA Tipe 1515 melalui Perbaikan Teropong Tidak Oper
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1