The Dismantling and Disposal Strategy of a Biological Shield for Minimization of Radioactive Concrete Waste During Decommissioning of a Nuclear Power Plant
{"title":"The Dismantling and Disposal Strategy of a Biological Shield for Minimization of Radioactive Concrete Waste During Decommissioning of a Nuclear Power Plant","authors":"전철승, 김창락","doi":"10.7733/JNFCWT.2017.15.4.355","DOIUrl":null,"url":null,"abstract":"The decommissioning of Kori unit 1, which was permanently shut down in June of 2017, will be the first instance of the dismantling of a commercial nuclear power plant in Korea. The disposal of waste during the dismantling process accounts for a large part of the total decommissioning cost. Therefore, structures consisting of activated and contaminated concrete must be economically and safely dismantled by establishing a proper dismantling strategy. This study focuses on optimized dismantling and disposal scenarios pertaining to a biological shield. Several dismantling cases, regulations and technologies related to waste treatment as these practices pertain to nuclear power plants are analyzed. To minimize the amount of waste from the biological shield dismantling process, an optimized dismantling scenario is presented and disposal alternatives for dismantled concrete waste are proposed.","PeriodicalId":17456,"journal":{"name":"Journal of the Nuclear Fuel Cycle and Waste Technology","volume":"2011 1","pages":"355-367"},"PeriodicalIF":0.0000,"publicationDate":"2017-12-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of the Nuclear Fuel Cycle and Waste Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.7733/JNFCWT.2017.15.4.355","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6
Abstract
The decommissioning of Kori unit 1, which was permanently shut down in June of 2017, will be the first instance of the dismantling of a commercial nuclear power plant in Korea. The disposal of waste during the dismantling process accounts for a large part of the total decommissioning cost. Therefore, structures consisting of activated and contaminated concrete must be economically and safely dismantled by establishing a proper dismantling strategy. This study focuses on optimized dismantling and disposal scenarios pertaining to a biological shield. Several dismantling cases, regulations and technologies related to waste treatment as these practices pertain to nuclear power plants are analyzed. To minimize the amount of waste from the biological shield dismantling process, an optimized dismantling scenario is presented and disposal alternatives for dismantled concrete waste are proposed.