Planning for Clean Water Needs in ITP Main Building

Sulaeman, Ikhsan Arif
{"title":"Planning for Clean Water Needs in ITP Main Building","authors":"Sulaeman, Ikhsan Arif","doi":"10.21063/jtm.2022.v12.i1.82-91","DOIUrl":null,"url":null,"abstract":"Plumbing system planning is an important part of a building to meet clean water needs. This study aims to plan a plumbing system for clean water in the ITP main building. Meeting the needs of clean water is planned to use water sources from shallow wells that are pumped into the roof tank (roof tank) and flowed gravitationally to pump two. The results of the calculation of the average water requirements of office buildings are 53 liters / day. The capacity of the roof tank needed to accommodate clean water is 2,100 liters, using two roof tanks with a capacity of 1,050 liters each. Roof tanks are placed on top of towers as high as 7.15 m. The diameter of the clean water pipe needed is 20-50 mm. The pump power needed is 0.071 kw and for the second pump is 0.63 kw. The type of pipe planned for this clean water plambing system is Polyvinyl Chloride (PVC) pipe.","PeriodicalId":31956,"journal":{"name":"Jurnal Teknik Mesin","volume":"122 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-04-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Teknik Mesin","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21063/jtm.2022.v12.i1.82-91","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Plumbing system planning is an important part of a building to meet clean water needs. This study aims to plan a plumbing system for clean water in the ITP main building. Meeting the needs of clean water is planned to use water sources from shallow wells that are pumped into the roof tank (roof tank) and flowed gravitationally to pump two. The results of the calculation of the average water requirements of office buildings are 53 liters / day. The capacity of the roof tank needed to accommodate clean water is 2,100 liters, using two roof tanks with a capacity of 1,050 liters each. Roof tanks are placed on top of towers as high as 7.15 m. The diameter of the clean water pipe needed is 20-50 mm. The pump power needed is 0.071 kw and for the second pump is 0.63 kw. The type of pipe planned for this clean water plambing system is Polyvinyl Chloride (PVC) pipe.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
ITP主楼清洁用水需求规划
管道系统规划是建筑物满足清洁用水需求的重要组成部分。本研究的目的是在创新科技园区主楼内设计洁净水管道系统。为了满足清洁用水的需求,计划使用浅水井的水源,这些水源被泵入屋顶水箱(屋顶水箱),并由重力流向二号泵。办公楼平均需水量计算结果为53升/天。使用两个容量为1050升的屋顶水箱,可以容纳2100升洁净水。屋顶水箱被放置在高达7.15米的塔的顶部。洁净水管的管径为20mm ~ 50mm。该水泵所需功率为0.071 kw,第二台水泵所需功率为0.63 kw。本纯水管道系统规划管路类型为聚氯乙烯(PVC)管。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
18 weeks
期刊最新文献
OPTIMALIZATION OF INTEGRAL FIN TUBE IN OUTSIDE CONDENSATION BASED ON FLOODING ANGLE THE EFFECT OF VARIATION IN THROTTLE BODY DIAMETER AND ENGINE SPEED ON POWER AND SPECIFIC FUEL CONSUMPTION IN A 149 CC GASOLINE ENGINE THE INFLUENCE OF USING THE TYPE OF ECU ELECTRONIC CONTROL UNIT) AND THE TYPE OF CENTRIFUGAL CLUTCH ON 150 CC ENGINE PERFORMANCE EFFECT OF DRYING TIME AND TEMPERATURE OF LPG FUEL CONSUMPTION DURING THE DRYING OF BAGE FISH TYPE TRAY DRAYER Perencanaan Transmisi Mekanik Roda Gigi dan Generator Turbin Vorteks PLTMH
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1