A. Orue, A. Lizarralde, U. Apaolaza, Itxaso Amorrortu
{"title":"Designing the process of implementing step three of the theory of constraints in a make-to-order environment: Integrating sales and operation planning","authors":"A. Orue, A. Lizarralde, U. Apaolaza, Itxaso Amorrortu","doi":"10.3926/jiem.5127","DOIUrl":null,"url":null,"abstract":"Purpose: The theory of constraints (TOC) methodology and its drum-buffer-rope (DBR) production planning and control system are well suited to managing production plants in complex environments. The objective of this study was to design an evolution of the systematic process for implementing the third step of the TOC methodology in make-to-order environments.Design/methodology/approach: Since the research concerned a real context and the phenomenon under investigation is contemporary, a case study was chosen as the research methodology.Findings: The study investigated, through a case study, the phases and steps necessary for the systematic process to be successfully implemented in a make-to-order environment.Originality/value: The three main contributions to the systematic implementation process for the third step of the TOC model are identified as the design of the last version of the systematic process, the integration of sales and operations through the TOC methodology and the introduction of the demand-driven adaptive enterprise model’s capacity buffer.","PeriodicalId":38526,"journal":{"name":"International Journal of Industrial Engineering and Management","volume":"16 1","pages":""},"PeriodicalIF":2.4000,"publicationDate":"2023-05-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Industrial Engineering and Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3926/jiem.5127","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 0
Abstract
Purpose: The theory of constraints (TOC) methodology and its drum-buffer-rope (DBR) production planning and control system are well suited to managing production plants in complex environments. The objective of this study was to design an evolution of the systematic process for implementing the third step of the TOC methodology in make-to-order environments.Design/methodology/approach: Since the research concerned a real context and the phenomenon under investigation is contemporary, a case study was chosen as the research methodology.Findings: The study investigated, through a case study, the phases and steps necessary for the systematic process to be successfully implemented in a make-to-order environment.Originality/value: The three main contributions to the systematic implementation process for the third step of the TOC model are identified as the design of the last version of the systematic process, the integration of sales and operations through the TOC methodology and the introduction of the demand-driven adaptive enterprise model’s capacity buffer.
期刊介绍:
International Journal of Industrial Engineering and Management (IJIEM) is an interdisciplinary international academic journal published quarterly. IJIEM serves researchers in the industrial engineering, manufacturing engineering and management fields. The major aims are: To collect and disseminate information on new and advanced developments in the field of industrial engineering and management; To encourage further progress in engineering and management methodology and applications; To cover the range of engineering and management development and usage in their use of managerial policies and strategies. Thus, IJIEM invites the submission of original, high quality, theoretical and application-oriented research; general surveys and critical reviews; educational or training articles including case studies, in the field of industrial engineering and management. The journal covers all aspects of industrial engineering and management, particularly: -Smart Manufacturing & Industry 4.0, -Production Systems, -Service Engineering, -Automation, Robotics and Mechatronics, -Information and Communication Systems, -ICT for Collaborative Manufacturing, -Quality, Maintenance and Logistics, -Safety and Reliability, -Organization and Human Resources, -Engineering Management, -Entrepreneurship and Innovation, -Project Management, -Marketing and Commerce, -Investment, Finance and Accounting, -Insurance Engineering and Management, -Media Engineering and Management, -Education and Practices in Industrial Engineering and Management.