Investigating the Causes of Poor Cost Control in Iraqi Construction Projects

IF 1.5 0 ENGINEERING, MULTIDISCIPLINARY Engineering, Technology & Applied Science Research Pub Date : 2022-02-12 DOI:10.48084/etasr.4661
N. Abbas, A. M. Burhan
{"title":"Investigating the Causes of Poor Cost Control in Iraqi Construction Projects","authors":"N. Abbas, A. M. Burhan","doi":"10.48084/etasr.4661","DOIUrl":null,"url":null,"abstract":"Controlling cost in construction projects is an essential issue. This study investigates the most critical problems that cause weakness in cost control in Iraqi construction projects. The quantitative technique was used by conducting a survey directed to professionals who work on construction projects. One hundred and sixty-four questionnaire forms were distributed to private sector companies, government companies, and government institutions, and the responses were subjected to the required statistical analysis. The results indicate that the most influential factors are the weakness in keeping up with the use of modern concepts, methods, and technologies, the delay in receiving the amounts due for work done from the owner, fluctuations in market prices, the lack of knowledge and the inefficient use of currently available tools and technology, and the security situation in the country. The results indicate that the Iraqi construction projects suffer from weakness in cost control, which causes them to stop or delay their delivery, and this needs serious and quick solutions. One of the most important solutions is the adoption of modern technologies and their inclusion in the construction sector and the development of special systems for managing costs that are appropriate to the Iraqi construction environment.","PeriodicalId":11826,"journal":{"name":"Engineering, Technology & Applied Science Research","volume":"542 1","pages":""},"PeriodicalIF":1.5000,"publicationDate":"2022-02-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering, Technology & Applied Science Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.48084/etasr.4661","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"0","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 5

Abstract

Controlling cost in construction projects is an essential issue. This study investigates the most critical problems that cause weakness in cost control in Iraqi construction projects. The quantitative technique was used by conducting a survey directed to professionals who work on construction projects. One hundred and sixty-four questionnaire forms were distributed to private sector companies, government companies, and government institutions, and the responses were subjected to the required statistical analysis. The results indicate that the most influential factors are the weakness in keeping up with the use of modern concepts, methods, and technologies, the delay in receiving the amounts due for work done from the owner, fluctuations in market prices, the lack of knowledge and the inefficient use of currently available tools and technology, and the security situation in the country. The results indicate that the Iraqi construction projects suffer from weakness in cost control, which causes them to stop or delay their delivery, and this needs serious and quick solutions. One of the most important solutions is the adoption of modern technologies and their inclusion in the construction sector and the development of special systems for managing costs that are appropriate to the Iraqi construction environment.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
伊拉克建设项目成本控制不佳的原因探析
工程造价控制是工程建设中的一个重要问题。本研究探讨了导致伊拉克建设项目成本控制薄弱的最关键问题。定量技术是通过对从事建筑项目的专业人员进行调查来使用的。向私营企业、政府企业和政府机构分发了164份问卷,并对回复进行了必要的统计分析。结果表明,影响最大的因素是未能跟上现代概念、方法和技术的使用,未能及时从业主那里收到应付工程款,市场价格波动,缺乏知识和对现有工具和技术的低效利用,以及该国的安全局势。结果表明,伊拉克建设项目在成本控制方面存在薄弱环节,导致项目停止或延迟交付,需要尽快认真解决。最重要的解决办法之一是采用现代技术并将其纳入建筑部门,并制定适合伊拉克建筑环境的管理费用的特殊制度。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Engineering, Technology & Applied Science Research
Engineering, Technology & Applied Science Research ENGINEERING, MULTIDISCIPLINARY-
CiteScore
3.00
自引率
46.70%
发文量
222
审稿时长
11 weeks
期刊最新文献
Malware Attack Detection in Large Scale Networks using the Ensemble Deep Restricted Boltzmann Machine Enhancement of Power System Security by the Intelligent Control of a Static Synchronous Series Compensator Mix Design of Fly Ash and GGBS based Geopolymer Concrete activated with Water Glass A New Approach on the Egyptian Black Sand Ilmenite Alteration Processes Boric Acid as a Safe Insecticide for Controlling the Mediterranean Fruit Fly Ceratitis Capitata Wiedemann (Diptera: Tephritidae)
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1