{"title":"CALCULATION OF GENERATOR REABILITY INDEX WITH LOAD FORECASTING AT PLTU (ELECTRIC STEAM POWER PLANT) ANGGREK IN GORONTALO","authors":"Irna Tri Yuniahastuti, Tedy Ardiansyah","doi":"10.46565/jreas.202274430-435","DOIUrl":null,"url":null,"abstract":"The calculation of the reliability at the PLTU Anggrek 2×25 MW Gorontalo obtained a LOLP value of 61.5 days/year. This value was still above the standardreliability value of PLN, this was due to the occurrence of PO (Planned Outage) and MO (Maintenance Outage) in unit 2 in June-July 2021, namely in theform of the first-year inspection in July. The FOR (Force Outage Rate) value was calculated based on the disturbance data from the generator in 2021. Thedaily load value was obtained from the load forecast value in January-July using FIS (Fuzzy Inference System) Mamdani type using the Matlab Toolbox. Theerror value in the proposed load forecast was 8%. The rules that had been compiled were used to predict expenses in August-December 2021. From the resultsof forecasting From the results of forecasting expenses, it was found that the trend of expenses was increasing every month.left with 10-pt Times New Roman bold. The abstract must be contained in one paragraph.","PeriodicalId":14343,"journal":{"name":"International Journal of Research in Engineering and Applied Sciences","volume":"29 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-03-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Research in Engineering and Applied Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.46565/jreas.202274430-435","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The calculation of the reliability at the PLTU Anggrek 2×25 MW Gorontalo obtained a LOLP value of 61.5 days/year. This value was still above the standardreliability value of PLN, this was due to the occurrence of PO (Planned Outage) and MO (Maintenance Outage) in unit 2 in June-July 2021, namely in theform of the first-year inspection in July. The FOR (Force Outage Rate) value was calculated based on the disturbance data from the generator in 2021. Thedaily load value was obtained from the load forecast value in January-July using FIS (Fuzzy Inference System) Mamdani type using the Matlab Toolbox. Theerror value in the proposed load forecast was 8%. The rules that had been compiled were used to predict expenses in August-December 2021. From the resultsof forecasting From the results of forecasting expenses, it was found that the trend of expenses was increasing every month.left with 10-pt Times New Roman bold. The abstract must be contained in one paragraph.