Control of Costs and Working Time of Road Improvement Kh. Syafi'i

Q4 Physics and Astronomy Neutron News Pub Date : 2022-07-31 DOI:10.29138/neutron.v22i01.176
Suci Fitriyani
{"title":"Control of Costs and Working Time of Road Improvement Kh. Syafi'i","authors":"Suci Fitriyani","doi":"10.29138/neutron.v22i01.176","DOIUrl":null,"url":null,"abstract":"This study aims to analyze the optimum time and cost of completing the work after the acceleration of the duration of the KH Road Improvement Project. Syafi'i in Suci Village, Manyar District, Gresik Regency using the Microsfot Project. Acceleration analysis by adding working hours and considering the resulting critical path. This research is also to find out the project performance compared to the initial project plan in terms of cost and time, to find out the estimated final cost of the project needed after the acceleration of implementation.","PeriodicalId":39014,"journal":{"name":"Neutron News","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-07-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Neutron News","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29138/neutron.v22i01.176","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Physics and Astronomy","Score":null,"Total":0}
引用次数: 0

Abstract

This study aims to analyze the optimum time and cost of completing the work after the acceleration of the duration of the KH Road Improvement Project. Syafi'i in Suci Village, Manyar District, Gresik Regency using the Microsfot Project. Acceleration analysis by adding working hours and considering the resulting critical path. This research is also to find out the project performance compared to the initial project plan in terms of cost and time, to find out the estimated final cost of the project needed after the acceleration of implementation.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
道路改善工程的成本与工期控制。Syafi胡
本研究旨在分析KH道路改善工程工期加快后完成工作的最佳时间和成本。Gresik Regency Manyar区苏奇村的Syafi'i使用微软项目。通过增加工时和考虑产生的关键路径进行加速度分析。本研究也是为了找出项目在成本和时间方面与最初的项目计划相比的绩效,找出项目加速实施后所需的最终成本估计。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Neutron News
Neutron News Physics and Astronomy-Nuclear and High Energy Physics
CiteScore
0.30
自引率
0.00%
发文量
36
期刊最新文献
Thermoreversible Gels of Hollow Silica Nanorod Dispersions Unveiling Nanoparticle Spin Structures Through Polarized Neutron Scattering Stefan U. Egelhaaf (1963–2023) Paul Burlet (1939–2023) Rapid Prediction of Inelastic Neutron Scattering Spectra
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1