F. Almathkour, Omar Belgacem, Said Toumi, B. Jarboui
{"title":"Branch and bound algorithm for solving the total weighted tardiness criterion for the permutation flowshop scheduling problem with time lags","authors":"F. Almathkour, Omar Belgacem, Said Toumi, B. Jarboui","doi":"10.2298/yjor210615023a","DOIUrl":null,"url":null,"abstract":"This paper deals with the permutation flowshop scheduling problem with time lags constraints to minimize the total weighted tardiness criterion by using the Branch and Bound algorithm. A new lower bound was developed for the flowshop scheduling problem. The computational experiments indicate that the proposed algorithm provides good solution in terms of quality and time requirements.","PeriodicalId":52438,"journal":{"name":"Yugoslav Journal of Operations Research","volume":"2014 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Yugoslav Journal of Operations Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2298/yjor210615023a","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Decision Sciences","Score":null,"Total":0}
引用次数: 1
Abstract
This paper deals with the permutation flowshop scheduling problem with time lags constraints to minimize the total weighted tardiness criterion by using the Branch and Bound algorithm. A new lower bound was developed for the flowshop scheduling problem. The computational experiments indicate that the proposed algorithm provides good solution in terms of quality and time requirements.