{"title":"Towards a comprehensive life cycle approach of building automation systems","authors":"M. Lehmann, Jorg Andreas, T. L. Mai, K. Kabitzsch","doi":"10.1109/ISIE.2017.8001474","DOIUrl":null,"url":null,"abstract":"The communication between different partners to handle the different tasks during the life cycle of buildings is far from being perfect. Fragmented engineering, lack of data consistency, insufficient system documentation or sensitivity for data sharing are only a few of many problems in this field that have not been efficiently handled through researches as well as in practice. This paper focuses on a deeper analysis of these problems mainly in the planning and engineering phases (they are the basis for all other phases) from both technical and economical point of view. An approach to handle these problems will be presented and thoroughly discussed.","PeriodicalId":6597,"journal":{"name":"2017 IEEE 26th International Symposium on Industrial Electronics (ISIE)","volume":"1 1","pages":"1541-1547"},"PeriodicalIF":0.0000,"publicationDate":"2017-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 IEEE 26th International Symposium on Industrial Electronics (ISIE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISIE.2017.8001474","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2
Abstract
The communication between different partners to handle the different tasks during the life cycle of buildings is far from being perfect. Fragmented engineering, lack of data consistency, insufficient system documentation or sensitivity for data sharing are only a few of many problems in this field that have not been efficiently handled through researches as well as in practice. This paper focuses on a deeper analysis of these problems mainly in the planning and engineering phases (they are the basis for all other phases) from both technical and economical point of view. An approach to handle these problems will be presented and thoroughly discussed.