A convolutional neural network for the resource-constrained project scheduling problem (RCPSP): A new approach

IF 1.4 Q3 OPERATIONS RESEARCH & MANAGEMENT SCIENCE Decision Science Letters Pub Date : 2023-01-01 DOI:10.5267/j.dsl.2023.2.002
A. Golab, E. S. Gooya, A. A. Falou, Mikael Cabon
{"title":"A convolutional neural network for the resource-constrained project scheduling problem (RCPSP): A new approach","authors":"A. Golab, E. S. Gooya, A. A. Falou, Mikael Cabon","doi":"10.5267/j.dsl.2023.2.002","DOIUrl":null,"url":null,"abstract":"All projects require a structure to meet project requirements and achieve established goals. This framework is called project management. Therefore, project management plays an important role in national development and economic growth. Project management includes various knowledge areas such as project integration management, project scope management, project schedule management, etc. The article focuses on the resource-constrained project scheduling known as problem so- called the resource-constrained project scheduling problem (RCPSP). The RCPSP is a part of schedule management. The standard RCPSP has two important constraints, resource constraints and precedence relationships of activities during project scheduling. The objective of the problem is to optimize and minimize the project duration, subject to the above constraints. In this paper, we develop a convolutional neural network approach to solve the standard single mode RCPSP. The advantage of this algorithm over conventional methods such as metaheuristics is that it does not need to generate many solutions or populations. In this paper, the serial schedule generation scheme (SSGS) is used to schedule the project activities using an evolved convolutional neural network (CNN) as a tool to select an appropriate priority rule to filter out a candidate activity. The evolved CNN learns according to the eight project parameters, namely network complexity, resource factor, resource strength, average work per activity, etc. The above parameters are the inputs of the network and are recalculated at each step of the project planning. Moreover, the developed network has priority rules which are the outputs of the developed neural network. Therefore, after the learning process, the network can automatically select an appropriate priority rule to filter an activity from the eligible activities. In this way, the algorithm is able to schedule all project activities according to the given project constraints. Finally, the performance of the Convolutional Neural Network (CNN) approach is investigated using standard benchmark problems from PSPLIB in comparison to the MLFNN approach and standard metaheuristics.","PeriodicalId":38141,"journal":{"name":"Decision Science Letters","volume":null,"pages":null},"PeriodicalIF":1.4000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Decision Science Letters","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5267/j.dsl.2023.2.002","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"OPERATIONS RESEARCH & MANAGEMENT SCIENCE","Score":null,"Total":0}
引用次数: 3

Abstract

All projects require a structure to meet project requirements and achieve established goals. This framework is called project management. Therefore, project management plays an important role in national development and economic growth. Project management includes various knowledge areas such as project integration management, project scope management, project schedule management, etc. The article focuses on the resource-constrained project scheduling known as problem so- called the resource-constrained project scheduling problem (RCPSP). The RCPSP is a part of schedule management. The standard RCPSP has two important constraints, resource constraints and precedence relationships of activities during project scheduling. The objective of the problem is to optimize and minimize the project duration, subject to the above constraints. In this paper, we develop a convolutional neural network approach to solve the standard single mode RCPSP. The advantage of this algorithm over conventional methods such as metaheuristics is that it does not need to generate many solutions or populations. In this paper, the serial schedule generation scheme (SSGS) is used to schedule the project activities using an evolved convolutional neural network (CNN) as a tool to select an appropriate priority rule to filter out a candidate activity. The evolved CNN learns according to the eight project parameters, namely network complexity, resource factor, resource strength, average work per activity, etc. The above parameters are the inputs of the network and are recalculated at each step of the project planning. Moreover, the developed network has priority rules which are the outputs of the developed neural network. Therefore, after the learning process, the network can automatically select an appropriate priority rule to filter an activity from the eligible activities. In this way, the algorithm is able to schedule all project activities according to the given project constraints. Finally, the performance of the Convolutional Neural Network (CNN) approach is investigated using standard benchmark problems from PSPLIB in comparison to the MLFNN approach and standard metaheuristics.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
基于卷积神经网络的资源约束项目调度问题研究
所有项目都需要一个结构来满足项目需求并实现既定目标。这个框架被称为项目管理。因此,项目管理在国家发展和经济增长中发挥着重要作用。项目管理包括项目集成管理、项目范围管理、项目进度管理等多个知识领域。本文主要研究资源约束项目调度问题,即资源约束项目调度问题(RCPSP)。RCPSP是进度管理的一部分。标准的RCPSP有两个重要的约束,资源约束和项目调度过程中活动的优先关系。问题的目标是在上述约束条件下优化和最小化项目工期。在本文中,我们开发了一种卷积神经网络方法来解决标准的单模RCPSP。与元启发式等传统方法相比,该算法的优点是不需要生成许多解或种群。本文采用串行调度生成方案(SSGS),利用进化卷积神经网络(CNN)作为工具,选择合适的优先级规则来过滤掉候选活动,对项目活动进行调度。进化后的CNN根据8个项目参数进行学习,即网络复杂度、资源因子、资源强度、每项活动的平均工作量等。以上参数为网络输入,在项目规划的每一步重新计算。此外,开发的网络具有优先级规则,这些规则是开发的神经网络的输出。因此,经过学习过程后,网络可以自动选择合适的优先级规则,从符合条件的活动中过滤某个活动。这样,该算法就能够根据给定的项目约束对所有项目活动进行调度。最后,利用PSPLIB的标准基准问题对卷积神经网络(CNN)方法的性能进行了研究,并与MLFNN方法和标准元启发式方法进行了比较。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Decision Science Letters
Decision Science Letters Decision Sciences-Decision Sciences (all)
CiteScore
3.40
自引率
5.30%
发文量
49
审稿时长
20 weeks
期刊最新文献
Time series prediction of novel coronavirus COVID-19 data in west Java using Gaussian processes and least median squared linear regression Determinants of woodcraft family business success Analytical evaluation of big data applications in E-commerce: A mixed method approach A two-stage SEM-artificial neural network analysis of the organizational effects of Internet of things adoption in auditing firms A novel crossover operator for genetic algorithm: Stas crossover
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1