A cost-benefit analysis of implementing a 54 MW solar PV plant in a South African platinum mining company: A case study

IF 0.6 4区 工程技术 Q4 ENERGY & FUELS Journal of Energy in Southern Africa Pub Date : 2021-09-19 DOI:10.17159/2413-3051/2021/v32i3a11604
Sam Barnard, A. Smit, S. Middelberg, M. J. Botha
{"title":"A cost-benefit analysis of implementing a 54 MW solar PV plant in a South African platinum mining company: A case study","authors":"Sam Barnard, A. Smit, S. Middelberg, M. J. Botha","doi":"10.17159/2413-3051/2021/v32i3a11604","DOIUrl":null,"url":null,"abstract":"A reliable and secure supply of energy is a prerequisite for adequate output and economic growth – especially in a platinum mining company. With exponential tariff increases, inadequate power supply leading to power cuts, and a carbon tax introduction, this study compared the costs with benefits by implementing a 54 MW solar photovoltaic (PV) plant. Two scenarios were compared over the same 20-year period in a case study of a South African platinum mining company operating in the platinum belt of Rustenburg. The first scenario was grounded upon the decision to proceed with the conventional manner of sourcing electricity from Eskom, South Africa’s power utility. The second scenario assessed the implementation of a 54 MW solar PV plant. The findings reveal that the company could generate 2 439 753 MWh of clean energy over 20 years with an investment of ZAR 910 857 920, giving a ZAR 563 205 994 (11%) carbon tax saving and a ZAR 5 614 426 335 (10%) reduction in electricity costs. Further, installing the solar PV plant could reinforce the company‘s dedication to protecting the environment and creating job opportunities through the employment of staff to install and maintain the plant.","PeriodicalId":15666,"journal":{"name":"Journal of Energy in Southern Africa","volume":"19 1","pages":""},"PeriodicalIF":0.6000,"publicationDate":"2021-09-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Energy in Southern Africa","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.17159/2413-3051/2021/v32i3a11604","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENERGY & FUELS","Score":null,"Total":0}
引用次数: 1

Abstract

A reliable and secure supply of energy is a prerequisite for adequate output and economic growth – especially in a platinum mining company. With exponential tariff increases, inadequate power supply leading to power cuts, and a carbon tax introduction, this study compared the costs with benefits by implementing a 54 MW solar photovoltaic (PV) plant. Two scenarios were compared over the same 20-year period in a case study of a South African platinum mining company operating in the platinum belt of Rustenburg. The first scenario was grounded upon the decision to proceed with the conventional manner of sourcing electricity from Eskom, South Africa’s power utility. The second scenario assessed the implementation of a 54 MW solar PV plant. The findings reveal that the company could generate 2 439 753 MWh of clean energy over 20 years with an investment of ZAR 910 857 920, giving a ZAR 563 205 994 (11%) carbon tax saving and a ZAR 5 614 426 335 (10%) reduction in electricity costs. Further, installing the solar PV plant could reinforce the company‘s dedication to protecting the environment and creating job opportunities through the employment of staff to install and maintain the plant.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
在南非铂矿公司实施54兆瓦太阳能光伏电站的成本效益分析:案例研究
可靠和安全的能源供应是充足产出和经济增长的先决条件,对铂矿公司来说尤其如此。由于电价呈指数级增长,电力供应不足导致电力削减,以及碳税的引入,本研究通过实施一个54兆瓦的太阳能光伏电站来比较成本和收益。在对一家在勒斯滕堡铂带经营的南非铂矿公司的案例研究中,对同一20年期间的两种情况进行了比较。第一种情况是基于决定继续以传统方式从南非电力公司Eskom采购电力。第二个情景评估了54兆瓦太阳能光伏电站的实施情况。研究结果显示,该公司可以在20年内产生2 439 753兆瓦时的清洁能源,投资910 857 920兰特,节省563 205 994兰特(11%)的碳税,减少5 614 426 335兰特(10%)的电力成本。此外,安装太阳能光伏电站可以加强公司对保护环境的奉献精神,并通过雇用员工来安装和维护电站,创造就业机会。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
3.00
自引率
0.00%
发文量
16
审稿时长
6 months
期刊介绍: The journal has a regional focus on southern Africa. Manuscripts that are accepted for consideration to publish in the journal must address energy issues in southern Africa or have a clear component relevant to southern Africa, including research that was set-up or designed in the region. The southern African region is considered to be constituted by the following fifteen (15) countries: Angola, Botswana, Democratic Republic of Congo, Lesotho, Malawi, Madagascar, Mauritius, Mozambique, Namibia, Seychelles, South Africa, Swaziland, Tanzania, Zambia and Zimbabwe. Within this broad field of energy research, topics of particular interest include energy efficiency, modelling, renewable energy, poverty, sustainable development, climate change mitigation, energy security, energy policy, energy governance, markets, technology and innovation.
期刊最新文献
Modelling NO2 emissions from Eskom’s coal fired power stations using Generalised Linear Models Trend analysis and inter-annual variability in wind speed in South Africa Commercialization of green hydrogen production from kraal manure in the Eastern Cape, South Africa: A review Investigation of Wind Data Resolution for Small Wind Turbine Performance Study Socio-economic analysis of solar photovoltaic-based mini-grids in rural communities: A Ugandan case study
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1