Force Majeure During COVID-19 Outbreaks: Case of the Cancellation and Termination of Government Construction Contracts

Muskibah Muskibah, Y. Yetniwati, Sasmiar Sasmiar, A. Holish
{"title":"Force Majeure During COVID-19 Outbreaks: Case of the Cancellation and Termination of Government Construction Contracts","authors":"Muskibah Muskibah, Y. Yetniwati, Sasmiar Sasmiar, A. Holish","doi":"10.15294/jils.v8i1.68937","DOIUrl":null,"url":null,"abstract":"Force majeure is a contractual clause commonly found in government construction work contracts, defining the circumstances that qualify as absolute or relative force majeure. This research aims to address two key questions: First, can the force majeure clause be invoked to justify the cancellation and termination of construction work contracts amidst the Covid-19 pandemic? Second, what is the method of accountability for risks associated with construction work contracts in light of the pandemic? Employing normative juridical research methods, this study concludes that the Covid-19 pandemic alone cannot serve as an automatic basis for contract cancellation or nullification under the force majeure clause. The service user, typically the government, may demand the successful completion of the project from the providers. However, the pandemic qualifies as a relative force majeure, shifting the liability for risk during contract implementation to the provider, subject to court decisions. Thus, legal events qualifying as force majeure during the Covid-19 outbreak will be determined by court decisions.","PeriodicalId":32877,"journal":{"name":"JILS Journal of Indonesian Legal Studies","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-05-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"JILS Journal of Indonesian Legal Studies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.15294/jils.v8i1.68937","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Social Sciences","Score":null,"Total":0}
引用次数: 0

Abstract

Force majeure is a contractual clause commonly found in government construction work contracts, defining the circumstances that qualify as absolute or relative force majeure. This research aims to address two key questions: First, can the force majeure clause be invoked to justify the cancellation and termination of construction work contracts amidst the Covid-19 pandemic? Second, what is the method of accountability for risks associated with construction work contracts in light of the pandemic? Employing normative juridical research methods, this study concludes that the Covid-19 pandemic alone cannot serve as an automatic basis for contract cancellation or nullification under the force majeure clause. The service user, typically the government, may demand the successful completion of the project from the providers. However, the pandemic qualifies as a relative force majeure, shifting the liability for risk during contract implementation to the provider, subject to court decisions. Thus, legal events qualifying as force majeure during the Covid-19 outbreak will be determined by court decisions.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
COVID-19爆发期间的不可抗力:政府建筑合同的取消和终止案例
不可抗力是政府建设工程合同中常见的合同条款,定义了绝对或相对不可抗力的情况。本研究旨在解决两个关键问题:第一,在Covid-19大流行期间,是否可以援引不可抗力条款来证明取消和终止建筑工程合同的合理性?第二,在疫情背景下,建筑工程合同相关风险的问责方法是什么?本研究采用规范的法律研究方法,得出结论:仅凭新冠肺炎疫情不能作为不可抗力条款下合同自动取消或无效的依据。服务使用者,通常是政府,可能会要求供应商成功完成项目。然而,大流行病属于相对不可抗力,合同履行期间的风险责任由供应商承担,须视法院判决而定。因此,在Covid-19爆发期间,符合不可抗力的法律事件将由法院判决确定。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
2.10
自引率
0.00%
发文量
13
审稿时长
20 weeks
期刊最新文献
Under-Legislation in Electronic Trials and Renewing Criminal Law Enforcement in Indonesia (Comparison with United States) Development of a Restitution Model in Optimizing Legal Protection for Victims of Human Trafficking in Indonesia The Driving Factors for Recidivism of Former Terrorism Convicts in Socio-Legal Perspective Indonesian Travel Policy during the Outbreaks: Vaccination and Quarantine Legal Culture and Policy on Indonesian Air Transportation The Intersection of the Progressive Law Theory and the Self-Declaration Concept of MSEs Halal Certification
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1