Resolving the challenges of multiple vendor 61850 implementations

Anthony Eshpeter
{"title":"Resolving the challenges of multiple vendor 61850 implementations","authors":"Anthony Eshpeter","doi":"10.1109/TDC.2016.7519867","DOIUrl":null,"url":null,"abstract":"To be designed for a self-monitoring protection and control system that would minimize wiring and troubleshooting, a 345kV Substation for a US Transmission Company for had to interoperate with multiple vendors' relays. An IEC 61850 based solution was chosen to facilitate multi-vendor compatibility. Interestingly, IEC 61850 interoperability turned out to be a major challenge as different vendors IEC 61850 software settings and implementations differ significantly. The project reinforces the importance of considering the initial cost of deployment but also the costs of potential upgrade paths as technology continues to improve.","PeriodicalId":6497,"journal":{"name":"2016 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)","volume":"34 1","pages":"1-7"},"PeriodicalIF":0.0000,"publicationDate":"2016-05-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDC.2016.7519867","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

To be designed for a self-monitoring protection and control system that would minimize wiring and troubleshooting, a 345kV Substation for a US Transmission Company for had to interoperate with multiple vendors' relays. An IEC 61850 based solution was chosen to facilitate multi-vendor compatibility. Interestingly, IEC 61850 interoperability turned out to be a major challenge as different vendors IEC 61850 software settings and implementations differ significantly. The project reinforces the importance of considering the initial cost of deployment but also the costs of potential upgrade paths as technology continues to improve.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
解决多个供应商61850实现的挑战
为了设计一个能够最大限度地减少布线和故障排除的自我监控保护和控制系统,一家美国输电公司的345kV变电站必须与多个供应商的继电器进行互操作。选择了基于IEC 61850的解决方案来促进多供应商兼容性。有趣的是,IEC 61850的互操作性是一个主要的挑战,因为不同供应商的IEC 61850软件设置和实现有很大的不同。该项目强调了考虑部署初始成本的重要性,以及随着技术不断改进,潜在升级路径的成本。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Fast evaluation of probabilistic total transfer capability considering multiple wind farms An automated model based fault locating method for distribution systems Fault location identification of a hybrid HVDC-VSC system containing cable and overhead line segments using transient data Conductor corrosion inspection of aluminum conductor steel reinforced transmission lines Microgrid load management and control strategies
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1