Preliminary Modeling Of Radiation Levels At The Fermilab PIP-II Linac

L. Cerutti, L. S. E. C. Baffes, S. J. Dixon, N. Mokhov, I. Rakhno, I. Tropin
{"title":"Preliminary Modeling Of Radiation Levels At The Fermilab PIP-II Linac","authors":"L. Cerutti, L. S. E. C. Baffes, S. J. Dixon, N. Mokhov, I. Rakhno, I. Tropin","doi":"10.18429/JACoW-IPAC2018-TUPAF074","DOIUrl":null,"url":null,"abstract":"PIP-II is the Fermilab's flagship project for providing powerful, high-intensity proton beams to the laboratory's experiments. The heart of PIP-II is an 800-MeV superconducting linac accelerator. It will be located in a new tunnel with new service buildings and connected to the present Booster through a new transfer line. To support the design of civil engineering and mechanical integration, this paper provides preliminary estimation of radiation level in the gallery at an operational beam loss limit of 0.1 W/m, by means of Monte Carlo calculations with FLUKA and MARS15 codes.","PeriodicalId":8436,"journal":{"name":"arXiv: Accelerator Physics","volume":"6 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-06-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"arXiv: Accelerator Physics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18429/JACoW-IPAC2018-TUPAF074","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

PIP-II is the Fermilab's flagship project for providing powerful, high-intensity proton beams to the laboratory's experiments. The heart of PIP-II is an 800-MeV superconducting linac accelerator. It will be located in a new tunnel with new service buildings and connected to the present Booster through a new transfer line. To support the design of civil engineering and mechanical integration, this paper provides preliminary estimation of radiation level in the gallery at an operational beam loss limit of 0.1 W/m, by means of Monte Carlo calculations with FLUKA and MARS15 codes.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
费米实验室PIP-II直线加速器辐射水平的初步模拟
PIP-II是费米实验室的旗舰项目,为实验室的实验提供强大的高强度质子束。PIP-II的核心是一个800兆电子伏的超导直线加速器。它将位于一条新的隧道内,有新的服务大楼,并通过一条新的换乘线与现有的助推器相连。为了支持土木工程和机械一体化的设计,本文利用FLUKA和MARS15代码进行蒙特卡罗计算,初步估计了在工作波束损耗极限为0.1 W/m时,廊道内的辐射水平。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Developing a 50 MeV LPA-based Injector at ATHENA for a Compact Storage Ring An Upgrade Path for the Fermilab Accelerator Complex Machine Learning-Based Direct Solver for One-To-Many Problems on Temporal Shaping of Electron Beams Adaptive Deep Learning for Time-Varying Systems With Hidden Parameters: Predicting Changing Input Beam Distributions of Compact Particle Accelerators Comment on “Fast-slow mode coupling instability for coasting beams in the presence of detuning impedance”
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1