People and places

A. Torrisi
{"title":"People and places","authors":"A. Torrisi","doi":"10.2307/1297329","DOIUrl":null,"url":null,"abstract":"2013 was a tough year for Orbite, but we have turned a corner. Things are going well and are on track. The first challenge and priority is finalising our high purity alumina (HPA) facility. That presents a list of challenges, but we are tackling them very well and are giving ourselves a 12-month timeline, following the raising of equity financing. We started on the HPA building in January this year. Priority number one is putting the first HPA plant into commercial production at the beginning of 2015, ramping it up to 3tpd in the first quarter of next year and finding commercial contracts with our potential customers, with whom we are discussing right now. \n \nThe HPA facility is actually a cornerstone for the other commercial activities, notably the waste monetisation. In 2015 we'll be converting and finalising the HPA facility to the chloride-based technology. The facility will become an industrial demo for our technology platform. It will then be used to finalise the design, and be able to bring in the red mud, fly ash or other mine tailings that we are looking at. The scaled-up plant will allow us to finalise the design of the first industrial in-situ plant. \n \nAustralian rare earths producer, Lynas Corp., appointed Amanda Lacaze as CEO. Amanda takes over from Eric Noyrez, who served as CEO for just over a year, leading the start-up of the company's rare earths mine at Mount Well, Australia. Lacaze was previously CEO of Commander Communications and executive chairman of Orion Telecommunications.","PeriodicalId":13542,"journal":{"name":"Industrial minerals","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Industrial minerals","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2307/1297329","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

2013 was a tough year for Orbite, but we have turned a corner. Things are going well and are on track. The first challenge and priority is finalising our high purity alumina (HPA) facility. That presents a list of challenges, but we are tackling them very well and are giving ourselves a 12-month timeline, following the raising of equity financing. We started on the HPA building in January this year. Priority number one is putting the first HPA plant into commercial production at the beginning of 2015, ramping it up to 3tpd in the first quarter of next year and finding commercial contracts with our potential customers, with whom we are discussing right now. The HPA facility is actually a cornerstone for the other commercial activities, notably the waste monetisation. In 2015 we'll be converting and finalising the HPA facility to the chloride-based technology. The facility will become an industrial demo for our technology platform. It will then be used to finalise the design, and be able to bring in the red mud, fly ash or other mine tailings that we are looking at. The scaled-up plant will allow us to finalise the design of the first industrial in-situ plant. Australian rare earths producer, Lynas Corp., appointed Amanda Lacaze as CEO. Amanda takes over from Eric Noyrez, who served as CEO for just over a year, leading the start-up of the company's rare earths mine at Mount Well, Australia. Lacaze was previously CEO of Commander Communications and executive chairman of Orion Telecommunications.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
人和地方
2013年对轨道公司来说是艰难的一年,但我们已经渡过了难关。事情进展顺利,正步入正轨。第一个挑战和首要任务是完成我们的高纯度氧化铝(HPA)设施。这带来了一系列挑战,但我们正在很好地应对它们,并在股权融资后给自己设定了12个月的时间表。我们在今年1月开始建造HPA大楼。首要任务是在2015年初将第一个HPA工厂投入商业生产,在明年第一季度将其提高到30吨/天,并与我们的潜在客户找到商业合同,我们正在与他们讨论。HPA设施实际上是其他商业活动的基石,特别是废物货币化。2015年,我们将把HPA设施改造成氯化物基技术。该设施将成为我们技术平台的工业演示。然后,它将用于完成设计,并能够引入我们正在研究的赤泥、粉煤灰或其他矿山尾矿。扩大规模的工厂将使我们能够完成第一个工业现场工厂的设计。澳大利亚稀土生产商Lynas Corp.任命阿曼达•拉卡兹(Amanda Lacaze)为首席执行长。阿曼达接替埃里克·诺伊雷兹,后者担任首席执行官一年多,领导该公司在澳大利亚芒特韦尔的稀土矿的启动。Lacaze曾担任Commander Communications的首席执行官和Orion Telecommunications的执行主席。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
People and places Back to black People and places Nerves of titanium The Great Occasion
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1