Analysis of Land Subsidence Using A Combination of Preloading and Prefabricated Vertical Drain Methods

Q4 Physics and Astronomy Neutron News Pub Date : 2022-07-31 DOI:10.29138/neutron.v22i01.172
Rahayu Rahayu, Syafwandi Syafwandi, Aldo Wirastana Adinegara, Agyanata Tua Munth, A. Sumarno
{"title":"Analysis of Land Subsidence Using A Combination of Preloading and Prefabricated Vertical Drain Methods","authors":"Rahayu Rahayu, Syafwandi Syafwandi, Aldo Wirastana Adinegara, Agyanata Tua Munth, A. Sumarno","doi":"10.29138/neutron.v22i01.172","DOIUrl":null,"url":null,"abstract":"Pertamina Balongan Indramayu's New Construction Jetty & Temporary Access Road Construction Project is the construction of a new jetty (silting prevention pier) located on a loamed land, which consists of dredging work on the area to be built by the jetty, protection of existing pipes, and erection of piles. In the implementation of the jetty construction, there are several reviews that need to be considered, such as soil elastic subsidence and soil consolidation subsidence. The method used for land subsidence is the Preloading method and is combined with the use of PVD to increase the time of decline. The results of this study found an elastic decrease using the Preloading method, a result of 0.7765 meters was obtained due to the presence of a stockpile load and an implementation load of 22.1312 kN/m2 on Elv. ± 1.00 m – STA. 0 + 025 m. Meanwhile, the decrease in consolidation (Sc + Ss) using the Preloading method, obtained a result of 4,949 meters due to the heap load and implementation load of 27,201 kN/m2 on Elv. ± 1.00 m – STA. 0 + 025 m and the length of time it takes to achieve the degree of consolidation of the plan (Uv = 90 %) using the Preloading method obtained results, which is 297 days. When the Preloading method is combined with using the Prefabricated Vertical Drain (PVD) method, the result of the length of time (t) needed to achieve the degree of consolidation of the plan (Uv = 90 %) is 158 days using a quadrilateral pattern installation PVD with a distance of 0.8 meters.","PeriodicalId":39014,"journal":{"name":"Neutron News","volume":"35 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-07-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Neutron News","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29138/neutron.v22i01.172","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Physics and Astronomy","Score":null,"Total":0}
引用次数: 0

Abstract

Pertamina Balongan Indramayu's New Construction Jetty & Temporary Access Road Construction Project is the construction of a new jetty (silting prevention pier) located on a loamed land, which consists of dredging work on the area to be built by the jetty, protection of existing pipes, and erection of piles. In the implementation of the jetty construction, there are several reviews that need to be considered, such as soil elastic subsidence and soil consolidation subsidence. The method used for land subsidence is the Preloading method and is combined with the use of PVD to increase the time of decline. The results of this study found an elastic decrease using the Preloading method, a result of 0.7765 meters was obtained due to the presence of a stockpile load and an implementation load of 22.1312 kN/m2 on Elv. ± 1.00 m – STA. 0 + 025 m. Meanwhile, the decrease in consolidation (Sc + Ss) using the Preloading method, obtained a result of 4,949 meters due to the heap load and implementation load of 27,201 kN/m2 on Elv. ± 1.00 m – STA. 0 + 025 m and the length of time it takes to achieve the degree of consolidation of the plan (Uv = 90 %) using the Preloading method obtained results, which is 297 days. When the Preloading method is combined with using the Prefabricated Vertical Drain (PVD) method, the result of the length of time (t) needed to achieve the degree of consolidation of the plan (Uv = 90 %) is 158 days using a quadrilateral pattern installation PVD with a distance of 0.8 meters.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
预压与预制垂直排水相结合的地面沉降分析
Pertamina Balongan Indramayu的新建筑防波堤和临时通道建设项目是在一个湿地上建造一个新的防波堤(防淤积墩),该项目包括在防波堤建造的区域进行疏浚工作,保护现有管道,以及架设桩基。在实施防波堤施工时,需要考虑土体弹性沉降和土体固结沉降等几个方面的审查。地面沉降采用预压法,并结合PVD法增加沉降时间。研究结果表明,采用预压方法,由于Elv上存在储备荷载和22.1312 kN/m2的实施荷载,弹性减小了0.7765米。±1.00 m - STA。0 + 025米。同时,由于Elv上的堆载和实施荷载为27201 kN/m2,采用预压方法减少固结(Sc + Ss)的结果为4949米。±1.00 m - STA。0 + 025 m和达到计划固结程度所需的时间长度(Uv = 90%)采用预压法获得结果,为297天。当预压法与预制垂直排水(PVD)法相结合时,采用四边形模式安装PVD,距离0.8米,达到计划固结程度(Uv = 90%)所需的时间长度(t)为158天。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Neutron News
Neutron News Physics and Astronomy-Nuclear and High Energy Physics
CiteScore
0.30
自引率
0.00%
发文量
36
期刊最新文献
Thermoreversible Gels of Hollow Silica Nanorod Dispersions Unveiling Nanoparticle Spin Structures Through Polarized Neutron Scattering Stefan U. Egelhaaf (1963–2023) Paul Burlet (1939–2023) Rapid Prediction of Inelastic Neutron Scattering Spectra
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1