Planning & Controlling Tourism Landscape Design Project using Critical Chain Project Management (CCPM) Schedulling

Alivia Rosy Walidonna, I. Vanany
{"title":"Planning & Controlling Tourism Landscape Design Project using Critical Chain Project Management (CCPM) Schedulling","authors":"Alivia Rosy Walidonna, I. Vanany","doi":"10.12962/j23546026.y2020i3.11205","DOIUrl":null,"url":null,"abstract":"― Project Management must meet the performance criteria of timeliness and budget control agreed between the project owner, contractor and supervisor. However, the level of uncertainty in the project implementation process is very high and causes delays and over budgeting. The Village Nongkojajar is a Proposed Integrated Agropark Project as a result of the revitalization of the non-productive land of the Horticultural Seed Farm owned by the Government of East Java Province. The Landscape Architecture Project has a Creative Value Chain which is divided into Creation - Implementation - Management. Therefore scheduling and controlling the project becomes important in order to to estimate working time and the project remains in accordance with the predetermined project timeline and whenever corrective action is needed. The relevance of Project Management in this research is that with high project problems, require a good planning process. The Project can be completed quickly than the specified time and more cost effective. Critical Chain Project Management (CCPM) is one method for completing and preparing projects that focus on the resource requirements for implementing projects by adding project buffers, feeding buffers and resource buffers. By analyzing using CCPM, researchers can look for optimization and control in implementing project scheduling.","PeriodicalId":14533,"journal":{"name":"IPTEK Journal of Proceedings Series","volume":"19 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-10-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IPTEK Journal of Proceedings Series","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.12962/j23546026.y2020i3.11205","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

― Project Management must meet the performance criteria of timeliness and budget control agreed between the project owner, contractor and supervisor. However, the level of uncertainty in the project implementation process is very high and causes delays and over budgeting. The Village Nongkojajar is a Proposed Integrated Agropark Project as a result of the revitalization of the non-productive land of the Horticultural Seed Farm owned by the Government of East Java Province. The Landscape Architecture Project has a Creative Value Chain which is divided into Creation - Implementation - Management. Therefore scheduling and controlling the project becomes important in order to to estimate working time and the project remains in accordance with the predetermined project timeline and whenever corrective action is needed. The relevance of Project Management in this research is that with high project problems, require a good planning process. The Project can be completed quickly than the specified time and more cost effective. Critical Chain Project Management (CCPM) is one method for completing and preparing projects that focus on the resource requirements for implementing projects by adding project buffers, feeding buffers and resource buffers. By analyzing using CCPM, researchers can look for optimization and control in implementing project scheduling.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
基于关键链项目管理(CCPM)调度的旅游景观设计项目规划与控制
-项目管理必须符合项目业主、承包商和主管商定的及时性和预算控制的绩效标准。然而,项目执行过程中的不确定性非常高,并导致延误和预算超支。Nongkojajar村是一个拟议的综合农业园区项目,是东爪哇省政府拥有的园艺种子农场非生产用地的振兴结果。景观设计项目有一个创意价值链,分为创意-实施-管理。因此,计划和控制项目变得很重要,以便估计工作时间,项目保持与预定的项目时间表一致,无论何时需要纠正措施。项目管理在本研究中的相关性在于,具有较高的项目问题,需要一个良好的规划过程。该项目可比规定时间更快完成,更具成本效益。关键链项目管理(CCPM)是一种完成和准备项目的方法,它通过增加项目缓冲、供给缓冲和资源缓冲来关注实施项目的资源需求。通过对CCPM的分析,研究人员可以在项目进度安排的实施中寻找优化和控制。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Increasing The Quality and Quantity of Marine Processed Production in Fisherman Villages Assistance of Handicraft Small Business in Increasing Capacity Greenhouse Potential based on Ecotourism and Education for Sustainable Village Economic Resilience Developing New Indonesia Circular Economy Indicators: A Lesson Learnt from European Union A Review of Circular Economy Index from Many Perspective
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1