Evaluation of undeveloped hard coal deposits and estimation of hard coal reserves in the Upper Silesian Coal Basin, Poland

IF 0.7 Q4 GREEN & SUSTAINABLE SCIENCE & TECHNOLOGY Journal of Sustainable Mining Pub Date : 2021-01-12 DOI:10.46873/2300-3960.1026
Tomasz Urych, J. Chećko, Marek Rosa, Anna Wątor
{"title":"Evaluation of undeveloped hard coal deposits and estimation of hard coal reserves in the Upper Silesian Coal Basin, Poland","authors":"Tomasz Urych, J. Chećko, Marek Rosa, Anna Wątor","doi":"10.46873/2300-3960.1026","DOIUrl":null,"url":null,"abstract":"The article presents the results of works concerning evaluation of undeveloped deposits in the Upper Silesian Coal Basin and an estimation of hard coal reserves which can be developed by 2050. Evaluation of hard coal deposits was established on criterions choice and their score determination. On the basis of obtained the final score and after consultations with experts in the field of hard coal mining, there were selected three areas of undeveloped deposits with the amount of about 1.99 Gt (billion metric tons) of anticipated economic resources which can extend the coal reserve base located in the direct vicinity of operating hard coal mines. Additionally, one undeveloped coal deposit with estimated resources amounts to about 1.15 Gt was selected as a potential deposit whose resources could be included in the reserves of operating mines, up to the depth of 1,500metres. Deposit areas were selected and hard coal reserves were estimated with a view to building new coal mines. For O swięcim-Polanka deposit, there was built a 3D geological model with estimated the amount of 924Mt (million metric tons) of anticipated economic resources of coal. An example of a deposit development with ventilation, extraction and transport/haulage underground roadways connecting coal seams with the surface are presented. The designed mine working was placed in the 3D geological deposit model which is a useful tool for designing spatial deposit management.","PeriodicalId":37284,"journal":{"name":"Journal of Sustainable Mining","volume":"57 1","pages":"230-242"},"PeriodicalIF":0.7000,"publicationDate":"2021-01-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Sustainable Mining","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.46873/2300-3960.1026","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"GREEN & SUSTAINABLE SCIENCE & TECHNOLOGY","Score":null,"Total":0}
引用次数: 2

Abstract

The article presents the results of works concerning evaluation of undeveloped deposits in the Upper Silesian Coal Basin and an estimation of hard coal reserves which can be developed by 2050. Evaluation of hard coal deposits was established on criterions choice and their score determination. On the basis of obtained the final score and after consultations with experts in the field of hard coal mining, there were selected three areas of undeveloped deposits with the amount of about 1.99 Gt (billion metric tons) of anticipated economic resources which can extend the coal reserve base located in the direct vicinity of operating hard coal mines. Additionally, one undeveloped coal deposit with estimated resources amounts to about 1.15 Gt was selected as a potential deposit whose resources could be included in the reserves of operating mines, up to the depth of 1,500metres. Deposit areas were selected and hard coal reserves were estimated with a view to building new coal mines. For O swięcim-Polanka deposit, there was built a 3D geological model with estimated the amount of 924Mt (million metric tons) of anticipated economic resources of coal. An example of a deposit development with ventilation, extraction and transport/haulage underground roadways connecting coal seams with the surface are presented. The designed mine working was placed in the 3D geological deposit model which is a useful tool for designing spatial deposit management.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
波兰上西里西亚煤盆地未开发的硬煤矿床评价和硬煤储量估算
本文介绍了上西里西亚煤盆地未开发矿床评价和2050年可开发的硬煤储量估算工作的成果。建立了硬煤矿床评价标准的选择和评分的确定。在获得最终评分的基础上,经与硬煤开采领域专家协商后,选定了3个未开发储量区,预计经济资源量约19.9亿吨,可扩大正在运营的硬煤直接邻近地区的煤炭储量基地。此外,还选择了一个估计资源量约为1.15 Gt的未开发煤层作为潜在矿床,其资源可包含在1500米深的运营矿山储量中。选择了矿区,估计了硬煤储量,以便建造新的煤矿。对O swięcim-Polanka矿床建立了三维地质模型,预计煤炭经济资源量为9.24亿吨。介绍了一个利用通风、开采和运输/运输地下巷道将煤层与地表连接起来的矿床开发实例。将设计的矿山工作置于三维地质矿床模型中,为空间矿床管理设计提供了一个有用的工具。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Journal of Sustainable Mining
Journal of Sustainable Mining Earth and Planetary Sciences-Geology
CiteScore
1.50
自引率
10.00%
发文量
20
审稿时长
16 weeks
期刊最新文献
The effect of blasting using low-density emulsion explosives Mathematical model for the management of the wave processes in three-winding transformers with consideration of the main magnetic flux in mining industry The valuation of exit option in a lignite mine using Monte Carlo simulation Numerical simulation on effect of coal pillar width on stability of retained roadway: A case study of Khe Cham Coal Mine, Vietnam Compressibility behavior of conditioned sandy clay considering the physical degradation of foam: tunneling issue
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1