Hydrological Analysis and Peak Discharge Determination

K. EbissaG.
{"title":"Hydrological Analysis and Peak Discharge Determination","authors":"K. EbissaG.","doi":"10.9790/1684-1403053348","DOIUrl":null,"url":null,"abstract":"Peak discharge Determination is one of the most important studies for Irrigation projects. The proposed of hydrologic design is to estimate maximum, average or minimum flood which the structure is expected to handle .This estimate has to be made quite accurately in order that the project can function properly. To estimate the magnitude of a flood peak the following alternative methods are available academically. In this study Hydrological analysis has been conducted based on 10years maximum daily rainfall data .The frequency analysis has been carried out by different methods and Log Pearson type III method is adopted .The peak discharge computed by United States Soil Conservation Service (USSCS) method is 1278m 3 /sec .Since this method over estimates the design flood, we adopt the peak discharge calculated by slope -area method.","PeriodicalId":14565,"journal":{"name":"IOSR Journal of Mechanical and Civil Engineering","volume":"42 1","pages":"33-48"},"PeriodicalIF":0.0000,"publicationDate":"2017-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IOSR Journal of Mechanical and Civil Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.9790/1684-1403053348","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

Peak discharge Determination is one of the most important studies for Irrigation projects. The proposed of hydrologic design is to estimate maximum, average or minimum flood which the structure is expected to handle .This estimate has to be made quite accurately in order that the project can function properly. To estimate the magnitude of a flood peak the following alternative methods are available academically. In this study Hydrological analysis has been conducted based on 10years maximum daily rainfall data .The frequency analysis has been carried out by different methods and Log Pearson type III method is adopted .The peak discharge computed by United States Soil Conservation Service (USSCS) method is 1278m 3 /sec .Since this method over estimates the design flood, we adopt the peak discharge calculated by slope -area method.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
水文分析和峰值流量测定
洪峰流量的确定是水利工程的重要研究内容之一。水文设计的建议是估计该结构预计能承受的最大、平均或最小洪水,这种估计必须相当准确,以使工程能够正常运作。为了估计洪峰的震级,学术上有以下几种方法可供选择。本研究以10年最大日降雨量资料为基础进行水文分析,采用不同方法进行频率分析,采用Log Pearson III型方法,美国水土保持局(USSCS)计算的洪峰流量为1278m3 /s,由于该方法对设计洪水的估计过大,故采用坡面法计算洪峰流量。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
An Evaluation OfSoil Condition And Flood Risk For Road Network Of Bangladesh—Compiled From Engineering Soil Maps And Digital Elevation Model Improved Limiting Criteria for Deflection in Multi-Story Buildings Subjected to Aerodynamic Load Study on Eco-Friendly Concrete Blocks without Cement and Curing Evaluation of High Performance Concrete by Partial Replacement of Cement with Silica Fume Natural Sand and Manufactured Sand Multi Response Optimization TIG welding parameters for dissimilar weld of MONEL 400 and AISI 304 using RSM
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1