Vestas: at the Right Pace

{"title":"Vestas: at the Right Pace","authors":"","doi":"10.1016/S1471-0846(07)70063-X","DOIUrl":null,"url":null,"abstract":"<div><p>It has been 12 years since Vestas installed its first offshore wind farm, consisting of 10 500 kW turbines. Since then Vestas has installed nearly 300 turbines offshore and has an additional 120 under contract for installation in 2007 and 2008, making the companies one of the most experienced suppliers of offshore wind power. But why go offshore in the first place, and what are the challenges that need to be overcome in the next few years? Vestas' Bo Moerup, vice president of Sales, reports.</p></div>","PeriodicalId":101067,"journal":{"name":"Refocus","volume":"8 3","pages":"Pages 28, 30"},"PeriodicalIF":0.0000,"publicationDate":"2007-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/S1471-0846(07)70063-X","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Refocus","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S147108460770063X","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

It has been 12 years since Vestas installed its first offshore wind farm, consisting of 10 500 kW turbines. Since then Vestas has installed nearly 300 turbines offshore and has an additional 120 under contract for installation in 2007 and 2008, making the companies one of the most experienced suppliers of offshore wind power. But why go offshore in the first place, and what are the challenges that need to be overcome in the next few years? Vestas' Bo Moerup, vice president of Sales, reports.

查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
维斯塔斯:以合适的速度
12年前,维斯塔斯安装了第一个海上风电场,由10台500千瓦的涡轮机组成。从那时起,维斯塔斯已经在海上安装了近300台涡轮机,并在2007年和2008年签订了另外120台涡轮机的安装合同,使公司成为海上风力发电最有经验的供应商之一。但是,为什么首先要走向海外?未来几年需要克服的挑战是什么?维斯塔斯销售副总裁Bo Moerup报道。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Blueprint for sustainability? What Price O&M? Wind in the USA Germany – model success? Future of wind power?
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1