{"title":"建筑业中传统权变估算的准确性","authors":"N. Jeyananthan, A. Shandraseharan, U. Kulatunga","doi":"10.31705/WCS.2021.5","DOIUrl":null,"url":null,"abstract":"Contingency amounts are allocated in the construction projects to deal with uncertainties arising during the projects. Contingency amounts are usually estimated traditionally by simply adding a percentage of the estimated contract amount. However, the traditional system of contingency estimation is heavily criticised as ineffective due to several reasons. Therefore, this research focuses on evaluating the level of accuracy of current contingency estimation techniques in the Sri Lankan context. This study adopted a mixed-method research approach. Empirical data were collected using expert interviews and questionnaire survey. Data collected from the expert interviews were analysed using manual content analysis. Descriptive statistics and inferential statistics were used to analyse the questionnaire survey data. Findings revealed that inexpensiveness is the highly motivating factor for the rigid usage of the traditional method to estimate contingency in the Sri Lankan context. Estimated contract amount, procurement method, payment method, and type of client were identified as highly influencing factors in contingency estimation. Finally, the hypothesis test of this study revealed that the traditional contingency estimation is ineffective. Since the traditional contingency estimation proved ineffective and highly inaccurate, experts in the industry should consider a flexible alternative approach in contingency estimation to improve the accuracy of the contingency amount.","PeriodicalId":320967,"journal":{"name":"Proceedings of the 9th World Construction Symposium 2021 on Reshaping construction: Strategic, Structural and Cultural Transformations towards the 'Next Normal'","volume":"30 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-07-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"ACCURACY OF TRADITIONAL CONTINGENCY ESTIMATION IN THE CONSTRUCTION INDUSTRY\",\"authors\":\"N. Jeyananthan, A. Shandraseharan, U. Kulatunga\",\"doi\":\"10.31705/WCS.2021.5\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Contingency amounts are allocated in the construction projects to deal with uncertainties arising during the projects. Contingency amounts are usually estimated traditionally by simply adding a percentage of the estimated contract amount. However, the traditional system of contingency estimation is heavily criticised as ineffective due to several reasons. Therefore, this research focuses on evaluating the level of accuracy of current contingency estimation techniques in the Sri Lankan context. This study adopted a mixed-method research approach. Empirical data were collected using expert interviews and questionnaire survey. Data collected from the expert interviews were analysed using manual content analysis. Descriptive statistics and inferential statistics were used to analyse the questionnaire survey data. Findings revealed that inexpensiveness is the highly motivating factor for the rigid usage of the traditional method to estimate contingency in the Sri Lankan context. Estimated contract amount, procurement method, payment method, and type of client were identified as highly influencing factors in contingency estimation. Finally, the hypothesis test of this study revealed that the traditional contingency estimation is ineffective. Since the traditional contingency estimation proved ineffective and highly inaccurate, experts in the industry should consider a flexible alternative approach in contingency estimation to improve the accuracy of the contingency amount.\",\"PeriodicalId\":320967,\"journal\":{\"name\":\"Proceedings of the 9th World Construction Symposium 2021 on Reshaping construction: Strategic, Structural and Cultural Transformations towards the 'Next Normal'\",\"volume\":\"30 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-07-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 9th World Construction Symposium 2021 on Reshaping construction: Strategic, Structural and Cultural Transformations towards the 'Next Normal'\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31705/WCS.2021.5\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 9th World Construction Symposium 2021 on Reshaping construction: Strategic, Structural and Cultural Transformations towards the 'Next Normal'","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31705/WCS.2021.5","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在建设项目中分配应急金额,以应对项目中出现的不确定性。传统上,应急金额通常是通过简单地加上估计合同金额的百分比来估计的。然而,由于一些原因,传统的权变估计系统被严重批评为无效的。因此,本研究的重点是评估斯里兰卡背景下当前应急估计技术的准确性水平。本研究采用混合方法研究方法。采用专家访谈法和问卷调查法收集实证数据。从专家访谈中收集的数据使用手动内容分析进行分析。采用描述性统计和推断性统计对问卷调查数据进行分析。研究结果表明,在斯里兰卡的情况下,成本低廉是严格使用传统方法来估计偶然性的高度激励因素。预计合同金额、采购方式、付款方式和客户类型是影响应急评估的重要因素。最后,本研究的假设检验表明,传统的权变估计是无效的。由于传统的权变估算方法效率低下且不准确,业内专家应考虑采用灵活的替代方法进行权变估算,以提高权变金额的准确性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
ACCURACY OF TRADITIONAL CONTINGENCY ESTIMATION IN THE CONSTRUCTION INDUSTRY
Contingency amounts are allocated in the construction projects to deal with uncertainties arising during the projects. Contingency amounts are usually estimated traditionally by simply adding a percentage of the estimated contract amount. However, the traditional system of contingency estimation is heavily criticised as ineffective due to several reasons. Therefore, this research focuses on evaluating the level of accuracy of current contingency estimation techniques in the Sri Lankan context. This study adopted a mixed-method research approach. Empirical data were collected using expert interviews and questionnaire survey. Data collected from the expert interviews were analysed using manual content analysis. Descriptive statistics and inferential statistics were used to analyse the questionnaire survey data. Findings revealed that inexpensiveness is the highly motivating factor for the rigid usage of the traditional method to estimate contingency in the Sri Lankan context. Estimated contract amount, procurement method, payment method, and type of client were identified as highly influencing factors in contingency estimation. Finally, the hypothesis test of this study revealed that the traditional contingency estimation is ineffective. Since the traditional contingency estimation proved ineffective and highly inaccurate, experts in the industry should consider a flexible alternative approach in contingency estimation to improve the accuracy of the contingency amount.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
EFFECT OF SOCIAL AND ENVIRONMENTAL FACTORS ON EXPRESSWAY CONSTRUCTION IN SRI LANKA ANALYSING THE GAP BETWEEN PREDICTED AND ACTUAL OPERATIONAL ENERGY CONSUMPTION IN BUILDINGS: A REVIEW ACCURACY OF TRADITIONAL CONTINGENCY ESTIMATION IN THE CONSTRUCTION INDUSTRY A framework to measure collaboration in a construction project COMPARISON BETWEEN THE TERMS CONSTRUCTABILITY AND BUILDABILITY: A SYSTEMATIC LITERATURE REVIEW
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1