{"title":"废弃煤矿地下抽水蓄能水电站的探索性经济分析","authors":"R. Madlener, Jan Martin Specht","doi":"10.2139/ssrn.2350106","DOIUrl":null,"url":null,"abstract":"This study researches the concept of underground pumped-storage hydro power plants in closed-down underground hard coal mines in Germany. After a review on how this could be realized technically, an economic feasibility analysis is presented, with a particular focus on the costs for the underground storage reservoir. The analysis is performed for different lower (i.e., underground) reservoir sizes and temporal arbitrage potentials (peak/off-peak electricity price spreads), and cost uncertainty is dealt with by means of a Monte Carlo simulation for two distinct head heights. The findings regarding costs and acceptability are compared with those of a classic (on-surface) pumped-storage hydro power plant in a mountainous area. Based on a techno-economic evaluation we conclude that under favorable conditions the realization of underground pumped-storage hydro power (UPSHP) plants seems both technically feasible and economically reasonable. More specifically, an extension of a tubular system seems the most promising option. A UPSHP plant in a mineshaft is probably slightly more expensive than a conventional one, an outcome that depends strongly on the feasible head height. However, the significant reduction of the adverse impacts on the landscape and on local residents, as well as a potentially large number of feasible sites in flat terrain, could make UPSHPs an interesting option for the future energy transition, not just in Germany but worldwide at sites where underground mining is being abandoned.","PeriodicalId":277238,"journal":{"name":"Nuclear Energy (Sustainability) eJournal","volume":"33 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"58","resultStr":"{\"title\":\"An Exploratory Economic Analysis of Underground Pumped-Storage Hydro Power Plants in Abandoned Coal Mines\",\"authors\":\"R. Madlener, Jan Martin Specht\",\"doi\":\"10.2139/ssrn.2350106\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study researches the concept of underground pumped-storage hydro power plants in closed-down underground hard coal mines in Germany. After a review on how this could be realized technically, an economic feasibility analysis is presented, with a particular focus on the costs for the underground storage reservoir. The analysis is performed for different lower (i.e., underground) reservoir sizes and temporal arbitrage potentials (peak/off-peak electricity price spreads), and cost uncertainty is dealt with by means of a Monte Carlo simulation for two distinct head heights. The findings regarding costs and acceptability are compared with those of a classic (on-surface) pumped-storage hydro power plant in a mountainous area. Based on a techno-economic evaluation we conclude that under favorable conditions the realization of underground pumped-storage hydro power (UPSHP) plants seems both technically feasible and economically reasonable. More specifically, an extension of a tubular system seems the most promising option. A UPSHP plant in a mineshaft is probably slightly more expensive than a conventional one, an outcome that depends strongly on the feasible head height. However, the significant reduction of the adverse impacts on the landscape and on local residents, as well as a potentially large number of feasible sites in flat terrain, could make UPSHPs an interesting option for the future energy transition, not just in Germany but worldwide at sites where underground mining is being abandoned.\",\"PeriodicalId\":277238,\"journal\":{\"name\":\"Nuclear Energy (Sustainability) eJournal\",\"volume\":\"33 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-02-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"58\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Nuclear Energy (Sustainability) eJournal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2139/ssrn.2350106\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Nuclear Energy (Sustainability) eJournal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2139/ssrn.2350106","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 58

摘要

本文研究了德国地下关停硬煤矿的地下抽水蓄能水电站的概念。在对如何在技术上实现这一目标进行审查之后,提出了经济可行性分析,特别关注地下水库的成本。对不同的较低(即地下)水库规模和时间套利潜力(峰值/非峰值电价差)进行分析,并通过蒙特卡罗模拟处理两个不同水头高度的成本不确定性。在成本和可接受性方面的研究结果与山区的传统抽水蓄能水电站进行了比较。在技术经济评价的基础上,认为在有利条件下,实现地下抽水蓄能电站在技术上是可行的,在经济上是合理的。更具体地说,管状系统的扩展似乎是最有希望的选择。矿井中的UPSHP电厂可能比传统电厂稍微贵一点,这个结果很大程度上取决于可行的水头高度。然而,显著减少对景观和当地居民的不利影响,以及在平坦地形上潜在的大量可行地点,可能使upshp成为未来能源转型的一个有趣选择,不仅在德国,而且在世界范围内,地下采矿正在被放弃。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
An Exploratory Economic Analysis of Underground Pumped-Storage Hydro Power Plants in Abandoned Coal Mines
This study researches the concept of underground pumped-storage hydro power plants in closed-down underground hard coal mines in Germany. After a review on how this could be realized technically, an economic feasibility analysis is presented, with a particular focus on the costs for the underground storage reservoir. The analysis is performed for different lower (i.e., underground) reservoir sizes and temporal arbitrage potentials (peak/off-peak electricity price spreads), and cost uncertainty is dealt with by means of a Monte Carlo simulation for two distinct head heights. The findings regarding costs and acceptability are compared with those of a classic (on-surface) pumped-storage hydro power plant in a mountainous area. Based on a techno-economic evaluation we conclude that under favorable conditions the realization of underground pumped-storage hydro power (UPSHP) plants seems both technically feasible and economically reasonable. More specifically, an extension of a tubular system seems the most promising option. A UPSHP plant in a mineshaft is probably slightly more expensive than a conventional one, an outcome that depends strongly on the feasible head height. However, the significant reduction of the adverse impacts on the landscape and on local residents, as well as a potentially large number of feasible sites in flat terrain, could make UPSHPs an interesting option for the future energy transition, not just in Germany but worldwide at sites where underground mining is being abandoned.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Interaction between an Electron and a Quark Down About the Triton Structure Techno-Economic Analysis Methods for Nuclear Power Plants Nuclear Chaos: The Exelon-PHI Merger and What it Means for Nuclear Power in the United States and the EPA's Carbon Emission Rules The Bataan Nuclear Power Plant in the Philippines: Lessons from a White Elephant Project
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1