Zhaofei Chu, Zhijun Wu, Quansheng Liu, Baoguo Liu, Jinglai Sun
{"title":"考虑纵向不连续开挖和衬砌顺序安装的深粘弹性汉堡岩衬砌圆形隧道解析解","authors":"Zhaofei Chu, Zhijun Wu, Quansheng Liu, Baoguo Liu, Jinglai Sun","doi":"10.1061/(ASCE)EM.1943-7889.0001912","DOIUrl":null,"url":null,"abstract":"AbstractTunneling stoppage often occurs during tunnel construction, especially in weak and rheological ground. The discontinuous excavation caused by the stoppage usually has a certain impact on th...","PeriodicalId":299892,"journal":{"name":"Journal of Engineering Mechanics-asce","volume":"2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"48","resultStr":"{\"title\":\"Analytical Solution for Lined Circular Tunnels in Deep Viscoelastic Burgers Rock Considering the Longitudinal Discontinuous Excavation and Sequential Installation of Liners\",\"authors\":\"Zhaofei Chu, Zhijun Wu, Quansheng Liu, Baoguo Liu, Jinglai Sun\",\"doi\":\"10.1061/(ASCE)EM.1943-7889.0001912\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"AbstractTunneling stoppage often occurs during tunnel construction, especially in weak and rheological ground. The discontinuous excavation caused by the stoppage usually has a certain impact on th...\",\"PeriodicalId\":299892,\"journal\":{\"name\":\"Journal of Engineering Mechanics-asce\",\"volume\":\"2 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-04-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"48\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Engineering Mechanics-asce\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1061/(ASCE)EM.1943-7889.0001912\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering Mechanics-asce","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1061/(ASCE)EM.1943-7889.0001912","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Analytical Solution for Lined Circular Tunnels in Deep Viscoelastic Burgers Rock Considering the Longitudinal Discontinuous Excavation and Sequential Installation of Liners
AbstractTunneling stoppage often occurs during tunnel construction, especially in weak and rheological ground. The discontinuous excavation caused by the stoppage usually has a certain impact on th...