艾利市建设项目延误的原因

Shams Al-Matarneh
{"title":"艾利市建设项目延误的原因","authors":"Shams Al-Matarneh","doi":"10.55923/jo.ijeal.3.4.104","DOIUrl":null,"url":null,"abstract":"The research aimed to study the causes and difficulties that beset the process of executing construction projects, by studying the provisions of the standard contracting contract FIDIC, which is used by the Ministry of Public Works and other public institutions in Jordan, whether the fourth edition of it or the 99th edition, noting that the unified contracting contract book for the year 1996 is It is only the FIDIC contract with its fourth edition and its amendments. Also, this study aims to clarify the causes and these difficulties and to indicate the solutions that can be proposed to avoid these difficulties. The study recommended the following:","PeriodicalId":327901,"journal":{"name":"International Journal of Engineering and Artificial Intelligence","volume":"383 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Reasons for delay in construction projects in the municipality of Aiy\",\"authors\":\"Shams Al-Matarneh\",\"doi\":\"10.55923/jo.ijeal.3.4.104\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The research aimed to study the causes and difficulties that beset the process of executing construction projects, by studying the provisions of the standard contracting contract FIDIC, which is used by the Ministry of Public Works and other public institutions in Jordan, whether the fourth edition of it or the 99th edition, noting that the unified contracting contract book for the year 1996 is It is only the FIDIC contract with its fourth edition and its amendments. Also, this study aims to clarify the causes and these difficulties and to indicate the solutions that can be proposed to avoid these difficulties. The study recommended the following:\",\"PeriodicalId\":327901,\"journal\":{\"name\":\"International Journal of Engineering and Artificial Intelligence\",\"volume\":\"383 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Engineering and Artificial Intelligence\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.55923/jo.ijeal.3.4.104\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Engineering and Artificial Intelligence","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55923/jo.ijeal.3.4.104","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

这项研究的目的是通过研究约旦公共工程部和其他公共机构所使用的标准承包合同FIDIC的规定,无论是第四版还是第99版,来研究困扰建筑项目执行过程的原因和困难,并注意到1996年统一的承包合同书是:只有FIDIC合同及其第四版及其修正案。此外,本研究旨在澄清原因和这些困难,并指出可以提出的解决方案,以避免这些困难。该研究建议如下:
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Reasons for delay in construction projects in the municipality of Aiy
The research aimed to study the causes and difficulties that beset the process of executing construction projects, by studying the provisions of the standard contracting contract FIDIC, which is used by the Ministry of Public Works and other public institutions in Jordan, whether the fourth edition of it or the 99th edition, noting that the unified contracting contract book for the year 1996 is It is only the FIDIC contract with its fourth edition and its amendments. Also, this study aims to clarify the causes and these difficulties and to indicate the solutions that can be proposed to avoid these difficulties. The study recommended the following:
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Early Detection of Drowsiness While Driving Using Bio Signals Enhancement of the Platinum nanoparticles of Biochemistry properties using a Scanning Electron Microscope SEM The impact of process design on improving company performance: An analytical study of the Municipalities Directorate Saladin Enhancement of the Polycrystalline Solar Panel Performance Using a Heatsink Cooling System with PCM Reasons for delay in construction projects in the municipality of Aiy
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1