{"title":"使用机器学习对成本敏感的航班延误预测","authors":"Sun Choi, Young Jin Kim, Simon Briceno, D. Mavris","doi":"10.1109/DASC.2017.8102035","DOIUrl":null,"url":null,"abstract":"This study provides a framework combining the sampling method called costing and supervised machine teaming algorithms to predict individual flight delays. The costing method converts cost-insensitive classifiers to cost-sensitive ones by subsampling examples from the original training dataset according to their misclassification costs. A weighted error function has been newly defined to evaluate the model's performance considering misclassification costs. And the function is measured by the various cost ratio between false positive error and false negative error. The cost ratio shows the relative importance of delays class to on-time class. The weighted error rate varies with the cost ratio and the model can have lower weighted error rate when the cost ratio is 10.","PeriodicalId":130890,"journal":{"name":"2017 IEEE/AIAA 36th Digital Avionics Systems Conference (DASC)","volume":"45 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"14","resultStr":"{\"title\":\"Cost-sensitive prediction of airline delays using machine learning\",\"authors\":\"Sun Choi, Young Jin Kim, Simon Briceno, D. Mavris\",\"doi\":\"10.1109/DASC.2017.8102035\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study provides a framework combining the sampling method called costing and supervised machine teaming algorithms to predict individual flight delays. The costing method converts cost-insensitive classifiers to cost-sensitive ones by subsampling examples from the original training dataset according to their misclassification costs. A weighted error function has been newly defined to evaluate the model's performance considering misclassification costs. And the function is measured by the various cost ratio between false positive error and false negative error. The cost ratio shows the relative importance of delays class to on-time class. The weighted error rate varies with the cost ratio and the model can have lower weighted error rate when the cost ratio is 10.\",\"PeriodicalId\":130890,\"journal\":{\"name\":\"2017 IEEE/AIAA 36th Digital Avionics Systems Conference (DASC)\",\"volume\":\"45 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"14\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2017 IEEE/AIAA 36th Digital Avionics Systems Conference (DASC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/DASC.2017.8102035\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 IEEE/AIAA 36th Digital Avionics Systems Conference (DASC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/DASC.2017.8102035","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Cost-sensitive prediction of airline delays using machine learning
This study provides a framework combining the sampling method called costing and supervised machine teaming algorithms to predict individual flight delays. The costing method converts cost-insensitive classifiers to cost-sensitive ones by subsampling examples from the original training dataset according to their misclassification costs. A weighted error function has been newly defined to evaluate the model's performance considering misclassification costs. And the function is measured by the various cost ratio between false positive error and false negative error. The cost ratio shows the relative importance of delays class to on-time class. The weighted error rate varies with the cost ratio and the model can have lower weighted error rate when the cost ratio is 10.