{"title":"基于解析和数值方法的关键路径叠加","authors":"J. Vesna, Letic Dusko","doi":"10.1109/SISY.2009.5291128","DOIUrl":null,"url":null,"abstract":"One of the results of the network planning is a diagram that has identified critical path whose duration is equal to the project duration. For the purpose of the research in this paper, network diagram is observed with critical and subcritical paths and the influence of subcritical path on project duration is taken into the consideration. Superposition has been applied in order to define project duration, i.e. getting resulting — superponed path. Used methods are: analytical method — based on Clark's equations and numerical method – Monte Carlo simulation. Analytical method was basis for developing the project duration assessment model, which main characteristics are also presented in this paper.","PeriodicalId":378688,"journal":{"name":"2009 7th International Symposium on Intelligent Systems and Informatics","volume":"227 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-10-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Superposition of critical paths based on analytical and numerical method\",\"authors\":\"J. Vesna, Letic Dusko\",\"doi\":\"10.1109/SISY.2009.5291128\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"One of the results of the network planning is a diagram that has identified critical path whose duration is equal to the project duration. For the purpose of the research in this paper, network diagram is observed with critical and subcritical paths and the influence of subcritical path on project duration is taken into the consideration. Superposition has been applied in order to define project duration, i.e. getting resulting — superponed path. Used methods are: analytical method — based on Clark's equations and numerical method – Monte Carlo simulation. Analytical method was basis for developing the project duration assessment model, which main characteristics are also presented in this paper.\",\"PeriodicalId\":378688,\"journal\":{\"name\":\"2009 7th International Symposium on Intelligent Systems and Informatics\",\"volume\":\"227 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-10-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 7th International Symposium on Intelligent Systems and Informatics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SISY.2009.5291128\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 7th International Symposium on Intelligent Systems and Informatics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SISY.2009.5291128","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

网络规划的结果之一是一个图表,该图表已经确定了关键路径,其持续时间等于项目持续时间。本文研究采用临界路径和亚临界路径观察网络图,并考虑了亚临界路径对工程工期的影响。叠加被应用于定义项目持续时间,即得到结果叠加路径。使用的方法是:解析法-基于克拉克方程和数值方法-蒙特卡罗模拟。分析方法是建立项目工期评估模型的基础,并介绍了该模型的主要特点。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Superposition of critical paths based on analytical and numerical method
One of the results of the network planning is a diagram that has identified critical path whose duration is equal to the project duration. For the purpose of the research in this paper, network diagram is observed with critical and subcritical paths and the influence of subcritical path on project duration is taken into the consideration. Superposition has been applied in order to define project duration, i.e. getting resulting — superponed path. Used methods are: analytical method — based on Clark's equations and numerical method – Monte Carlo simulation. Analytical method was basis for developing the project duration assessment model, which main characteristics are also presented in this paper.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Calibration machine for linear scales Wireless sensory control for mobile robot navigation Some criteria for equality of possibilistic variables Superposition of critical paths based on analytical and numerical method Common fixed point theorem in fuzzy metric spaces
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1