{"title":"位于路易斯安那州威克斯岛的美国战略石油储备(SPR)储存设施上的矿井引起的天坑:地质缓解和环境监测","authors":"J. Neal","doi":"10.1201/9781003078128-46","DOIUrl":null,"url":null,"abstract":"A sinkhole formed over the former salt mine used for crude oil storage by the U.S. Strategic Petroleum Reserve at Weeks Island, Louisiana. This created a dilemma because in-mine grouting was not possible, and external grouting, although possible, was impractical. However, environmental protection during oil withdrawal and facility decommissioning was considered critical and alternative solutions were essential. Mitigation of, the sinkhole growth over the salt mine was accomplished by injecting saturated brine directly into the sinkhole throat, and by constructing a cylindrical freeze curtain around and into the dissolution orifice at the top of the salt dome. These measures vastly reduced the threat of major surface collapse around the sinkhole during oil transfer and subsequent brine backfill. The greater bulk of the crude oil was removed from the mine during 1995-6. Final skimming operations will remove residual oil trapped in low spots, concurrent with initiating backfill of the mine with saturated brine. Environmental monitoring during 1995-9 will assure that environmental surety is achieved.","PeriodicalId":231730,"journal":{"name":"The Engineering Geology and Hydrology of Karst Terrains","volume":"52 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1997-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Mine-induced sinkholes over the US Strategic Petroleum Reserve (SPR) storage facility at Weeks Island, Louisiana: Geologic mitigation and environmental monitoring\",\"authors\":\"J. Neal\",\"doi\":\"10.1201/9781003078128-46\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A sinkhole formed over the former salt mine used for crude oil storage by the U.S. Strategic Petroleum Reserve at Weeks Island, Louisiana. This created a dilemma because in-mine grouting was not possible, and external grouting, although possible, was impractical. However, environmental protection during oil withdrawal and facility decommissioning was considered critical and alternative solutions were essential. Mitigation of, the sinkhole growth over the salt mine was accomplished by injecting saturated brine directly into the sinkhole throat, and by constructing a cylindrical freeze curtain around and into the dissolution orifice at the top of the salt dome. These measures vastly reduced the threat of major surface collapse around the sinkhole during oil transfer and subsequent brine backfill. The greater bulk of the crude oil was removed from the mine during 1995-6. Final skimming operations will remove residual oil trapped in low spots, concurrent with initiating backfill of the mine with saturated brine. Environmental monitoring during 1995-9 will assure that environmental surety is achieved.\",\"PeriodicalId\":231730,\"journal\":{\"name\":\"The Engineering Geology and Hydrology of Karst Terrains\",\"volume\":\"52 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1997-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"The Engineering Geology and Hydrology of Karst Terrains\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1201/9781003078128-46\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Engineering Geology and Hydrology of Karst Terrains","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1201/9781003078128-46","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

位于路易斯安那州威克斯岛的美国战略石油储备公司以前用于原油储存的盐矿上方形成了一个天坑。这造成了一个困境,因为矿井内灌浆是不可能的,而外部灌浆虽然可能,但不切实际。然而,采油和设施退役期间的环境保护被认为是至关重要的,替代解决方案是必不可少的。通过将饱和盐水直接注入陷坑喉道,并在盐丘顶部的溶解孔周围和内部建造一个圆柱形冻结幕,可以缓解盐矿上陷坑的增长。这些措施大大减少了在石油转移和随后的盐水回填期间天坑周围地表塌陷的威胁。1995年至1995年期间,大部分原油被从矿井中运出。最后的撇油作业将清除困在低点的残余油,同时开始用饱和盐水进行矿山回填。1995- 1999年期间的环境监测将确保实现环境保障。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Mine-induced sinkholes over the US Strategic Petroleum Reserve (SPR) storage facility at Weeks Island, Louisiana: Geologic mitigation and environmental monitoring
A sinkhole formed over the former salt mine used for crude oil storage by the U.S. Strategic Petroleum Reserve at Weeks Island, Louisiana. This created a dilemma because in-mine grouting was not possible, and external grouting, although possible, was impractical. However, environmental protection during oil withdrawal and facility decommissioning was considered critical and alternative solutions were essential. Mitigation of, the sinkhole growth over the salt mine was accomplished by injecting saturated brine directly into the sinkhole throat, and by constructing a cylindrical freeze curtain around and into the dissolution orifice at the top of the salt dome. These measures vastly reduced the threat of major surface collapse around the sinkhole during oil transfer and subsequent brine backfill. The greater bulk of the crude oil was removed from the mine during 1995-6. Final skimming operations will remove residual oil trapped in low spots, concurrent with initiating backfill of the mine with saturated brine. Environmental monitoring during 1995-9 will assure that environmental surety is achieved.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Source identification investigations of petroleum contaminated groundwater in the Missouri Ozarks Groundwater tracing in the epikarst Rationale and methodology for approximating spring-basin boundaries in the mantled karst terrane of the Springfield Plateau, northwestern Arkansas Gypsum karst geohazards in China An example of the use of jet grouting to permit tunneling in chemically weathered limestone
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1