具有日调节能力的水电站短期自调度。智利Los Molles和Sauzal的案例研究

J. Villavicencio, R. Ramírez, E. Pereira-Bonvallet
{"title":"具有日调节能力的水电站短期自调度。智利Los Molles和Sauzal的案例研究","authors":"J. Villavicencio, R. Ramírez, E. Pereira-Bonvallet","doi":"10.1109/PESGM.2015.7286289","DOIUrl":null,"url":null,"abstract":"A mixed integer linear programming (MILP) model for scheduling of the short-term operation of a price-taker hydroelectric plant is presented. The objective of the model is to maximize the profit of energy production in the next hours' operations. Non-linear production curves of hydro power units are considered through a piecewise representation. A detailed modeling of the hydro network is also described. Realistic test-cases of Los Molles and Sauzal-Sauzalito power plants, both part of the Enel group operations in Chile, are analyzed in detail. Results of real operation are compared to the schedules produced with the model showing the potential of the proposed approach in the industry.","PeriodicalId":423639,"journal":{"name":"2015 IEEE Power & Energy Society General Meeting","volume":"136 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-07-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Short term self scheduling of hydro power plants with intra-day regulation capacity. Case study of Los Molles and Sauzal in Chile\",\"authors\":\"J. Villavicencio, R. Ramírez, E. Pereira-Bonvallet\",\"doi\":\"10.1109/PESGM.2015.7286289\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A mixed integer linear programming (MILP) model for scheduling of the short-term operation of a price-taker hydroelectric plant is presented. The objective of the model is to maximize the profit of energy production in the next hours' operations. Non-linear production curves of hydro power units are considered through a piecewise representation. A detailed modeling of the hydro network is also described. Realistic test-cases of Los Molles and Sauzal-Sauzalito power plants, both part of the Enel group operations in Chile, are analyzed in detail. Results of real operation are compared to the schedules produced with the model showing the potential of the proposed approach in the industry.\",\"PeriodicalId\":423639,\"journal\":{\"name\":\"2015 IEEE Power & Energy Society General Meeting\",\"volume\":\"136 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-07-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 IEEE Power & Energy Society General Meeting\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PESGM.2015.7286289\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 IEEE Power & Energy Society General Meeting","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PESGM.2015.7286289","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

提出了一个用于水电站短期运行调度的混合整数线性规划(MILP)模型。该模型的目标是在接下来的几个小时内使能源生产的利润最大化。采用分段表示的方法考虑水电机组的非线性生产曲线。并对水网进行了详细的建模。本文详细分析了Enel集团在智利运营的Los Molles和Sauzal-Sauzalito电厂的实际测试案例。将实际操作结果与模型生成的时间表进行了比较,显示了所提出方法在工业中的潜力。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Short term self scheduling of hydro power plants with intra-day regulation capacity. Case study of Los Molles and Sauzal in Chile
A mixed integer linear programming (MILP) model for scheduling of the short-term operation of a price-taker hydroelectric plant is presented. The objective of the model is to maximize the profit of energy production in the next hours' operations. Non-linear production curves of hydro power units are considered through a piecewise representation. A detailed modeling of the hydro network is also described. Realistic test-cases of Los Molles and Sauzal-Sauzalito power plants, both part of the Enel group operations in Chile, are analyzed in detail. Results of real operation are compared to the schedules produced with the model showing the potential of the proposed approach in the industry.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Information theoretic index for regime shifts in power systems Optimal voltage regulation for unbalanced distribution networks considering distributed energy resources Evaluation of NERC's BRD frequency control standard in hydroelectric generation Distributed multi-agent scheme to improve dynamic voltage stability of distribution networks A multiagent system for residential DC microgrids
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1