{"title":"实现了一个电弧闪光程序","authors":"S. Drzymala","doi":"10.1109/CITCON.2014.6820112","DOIUrl":null,"url":null,"abstract":"This paper will address the methodology used to bring two cement companies and related vertically integrated facilities into compliance with NFPA 70E® requirements, utilizing in-house resources. With the help of commonly available software tools, it is feasible to conquer this seemingly impossible task in an economical fashion.","PeriodicalId":422446,"journal":{"name":"2014 IEEE-IAS/PCA Cement Industry Technical Conference","volume":"367 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-04-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Implementation of an arc flash program\",\"authors\":\"S. Drzymala\",\"doi\":\"10.1109/CITCON.2014.6820112\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper will address the methodology used to bring two cement companies and related vertically integrated facilities into compliance with NFPA 70E® requirements, utilizing in-house resources. With the help of commonly available software tools, it is feasible to conquer this seemingly impossible task in an economical fashion.\",\"PeriodicalId\":422446,\"journal\":{\"name\":\"2014 IEEE-IAS/PCA Cement Industry Technical Conference\",\"volume\":\"367 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-04-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 IEEE-IAS/PCA Cement Industry Technical Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CITCON.2014.6820112\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 IEEE-IAS/PCA Cement Industry Technical Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CITCON.2014.6820112","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
This paper will address the methodology used to bring two cement companies and related vertically integrated facilities into compliance with NFPA 70E® requirements, utilizing in-house resources. With the help of commonly available software tools, it is feasible to conquer this seemingly impossible task in an economical fashion.