{"title":"一种基于模糊分层神经网络的短期负荷预测模糊自适应修正方案","authors":"P. Dash, S. Dash, S. Rahman","doi":"10.1109/ANN.1993.264309","DOIUrl":null,"url":null,"abstract":"A hybrid neural network-fuzzy expert system is developed to forecast one hour to forty-eight hour ahead electric load accurately. The fuzzy membership values of load and other weather variables are the inputs to the neural network and the output comprises the membership value of the predicted load. An adaptive fuzzy correction scheme is used to forecast the final load by using a fuzzy rule base and fuzzy inference mechanism. The paper also presents a fuzzy pattern classification approach for identifying the day-type from the historical load database to be used for training the neural network. Extensive studies have been performed for all seasons, although the results for a typical winter day are given in the paper to demonstrate the powerfulness of this technique.<<ETX>>","PeriodicalId":121897,"journal":{"name":"[1993] Proceedings of the Second International Forum on Applications of Neural Networks to Power Systems","volume":"43 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1993-04-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"14","resultStr":"{\"title\":\"A fuzzy adaptive correction scheme for short term load forecasting using fuzzy layered neural network\",\"authors\":\"P. Dash, S. Dash, S. Rahman\",\"doi\":\"10.1109/ANN.1993.264309\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A hybrid neural network-fuzzy expert system is developed to forecast one hour to forty-eight hour ahead electric load accurately. The fuzzy membership values of load and other weather variables are the inputs to the neural network and the output comprises the membership value of the predicted load. An adaptive fuzzy correction scheme is used to forecast the final load by using a fuzzy rule base and fuzzy inference mechanism. The paper also presents a fuzzy pattern classification approach for identifying the day-type from the historical load database to be used for training the neural network. Extensive studies have been performed for all seasons, although the results for a typical winter day are given in the paper to demonstrate the powerfulness of this technique.<<ETX>>\",\"PeriodicalId\":121897,\"journal\":{\"name\":\"[1993] Proceedings of the Second International Forum on Applications of Neural Networks to Power Systems\",\"volume\":\"43 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1993-04-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"14\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"[1993] Proceedings of the Second International Forum on Applications of Neural Networks to Power Systems\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ANN.1993.264309\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"[1993] Proceedings of the Second International Forum on Applications of Neural Networks to Power Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ANN.1993.264309","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A fuzzy adaptive correction scheme for short term load forecasting using fuzzy layered neural network
A hybrid neural network-fuzzy expert system is developed to forecast one hour to forty-eight hour ahead electric load accurately. The fuzzy membership values of load and other weather variables are the inputs to the neural network and the output comprises the membership value of the predicted load. An adaptive fuzzy correction scheme is used to forecast the final load by using a fuzzy rule base and fuzzy inference mechanism. The paper also presents a fuzzy pattern classification approach for identifying the day-type from the historical load database to be used for training the neural network. Extensive studies have been performed for all seasons, although the results for a typical winter day are given in the paper to demonstrate the powerfulness of this technique.<>