{"title":"多处理机任务调度的分支定界策略研究","authors":"M. Rahman, Muhammad F. I. Chowdhury","doi":"10.1109/ICCIT.2009.5407146","DOIUrl":null,"url":null,"abstract":"The multiprocessor task graph scheduling problem has been extensively studied as academic optimization problem which occurs in optimizing the execution time of parallel algorithm with parallel computer. The problem is already being known as one of the NP-hard problems. There are many good approaches made with many optimizing algorithm to find out the optimum solution for this problem with less computational time. One of them is branch and bound algorithm. In this paper, we studied the branch and bound algorithm for the multiprocessor scheduling problem.","PeriodicalId":443258,"journal":{"name":"2009 12th International Conference on Computers and Information Technology","volume":"16 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"19","resultStr":"{\"title\":\"Examining branch and bound strategy on multiprocessor task scheduling\",\"authors\":\"M. Rahman, Muhammad F. I. Chowdhury\",\"doi\":\"10.1109/ICCIT.2009.5407146\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The multiprocessor task graph scheduling problem has been extensively studied as academic optimization problem which occurs in optimizing the execution time of parallel algorithm with parallel computer. The problem is already being known as one of the NP-hard problems. There are many good approaches made with many optimizing algorithm to find out the optimum solution for this problem with less computational time. One of them is branch and bound algorithm. In this paper, we studied the branch and bound algorithm for the multiprocessor scheduling problem.\",\"PeriodicalId\":443258,\"journal\":{\"name\":\"2009 12th International Conference on Computers and Information Technology\",\"volume\":\"16 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"19\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 12th International Conference on Computers and Information Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICCIT.2009.5407146\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 12th International Conference on Computers and Information Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICCIT.2009.5407146","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Examining branch and bound strategy on multiprocessor task scheduling
The multiprocessor task graph scheduling problem has been extensively studied as academic optimization problem which occurs in optimizing the execution time of parallel algorithm with parallel computer. The problem is already being known as one of the NP-hard problems. There are many good approaches made with many optimizing algorithm to find out the optimum solution for this problem with less computational time. One of them is branch and bound algorithm. In this paper, we studied the branch and bound algorithm for the multiprocessor scheduling problem.