{"title":"铁路系统电力系统资产管理","authors":"Tan Yong Peow, Loi Boon Toon, S. Goh","doi":"10.1109/IPEC.2005.206977","DOIUrl":null,"url":null,"abstract":"The project life cycle of the power system in the railway system starts from the concept study on the power system and its requirements. The study focuses on critical engineering and operational requirements like EMC, earthing and bonding system, stray current, emergency loadings, uninterrupted power requirements etc. The paper presents the project life-cycle of an integrated asset and design management of the power system in a railway system. The lifecycle stages starts from concept study to the decommissioning of the system. Asset management study is carried out on how the equipment maintenance and replacement are tracked by a maintenance management tool. The life-cycle carries on to design, procurement, manufacturing, installation, testing, operation and asset replacement","PeriodicalId":164802,"journal":{"name":"2005 International Power Engineering Conference","volume":"120 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Asset management of the power system in a rail system\",\"authors\":\"Tan Yong Peow, Loi Boon Toon, S. Goh\",\"doi\":\"10.1109/IPEC.2005.206977\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The project life cycle of the power system in the railway system starts from the concept study on the power system and its requirements. The study focuses on critical engineering and operational requirements like EMC, earthing and bonding system, stray current, emergency loadings, uninterrupted power requirements etc. The paper presents the project life-cycle of an integrated asset and design management of the power system in a railway system. The lifecycle stages starts from concept study to the decommissioning of the system. Asset management study is carried out on how the equipment maintenance and replacement are tracked by a maintenance management tool. The life-cycle carries on to design, procurement, manufacturing, installation, testing, operation and asset replacement\",\"PeriodicalId\":164802,\"journal\":{\"name\":\"2005 International Power Engineering Conference\",\"volume\":\"120 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2005 International Power Engineering Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IPEC.2005.206977\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2005 International Power Engineering Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IPEC.2005.206977","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

铁路系统中电力系统的项目生命周期是从对电力系统及其需求的概念研究出发的。该研究侧重于关键的工程和操作要求,如EMC、接地和bonding系统、杂散电流、应急负载、不间断电源要求等。本文介绍了铁路综合资产的项目生命周期及电力系统的设计管理。生命周期阶段从概念研究到系统退役。资产管理研究如何通过维护管理工具跟踪设备的维护和更换。生命周期从设计、采购、制造、安装、测试、运行到资产更换
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Asset management of the power system in a rail system
The project life cycle of the power system in the railway system starts from the concept study on the power system and its requirements. The study focuses on critical engineering and operational requirements like EMC, earthing and bonding system, stray current, emergency loadings, uninterrupted power requirements etc. The paper presents the project life-cycle of an integrated asset and design management of the power system in a railway system. The lifecycle stages starts from concept study to the decommissioning of the system. Asset management study is carried out on how the equipment maintenance and replacement are tracked by a maintenance management tool. The life-cycle carries on to design, procurement, manufacturing, installation, testing, operation and asset replacement
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
The application of association rule mining in power system restoration The influence of model mismatch to power system calculation, part II: on the stability calculation Optimal participation of a microgrid to the energy market with an intelligent EMS An account of a modified lightning protection system for power stations An improved usage allocation method for deregulated transmission systems
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1