这里,那里有龙:考虑风险管理中的右尾

C. Smart
{"title":"这里,那里有龙:考虑风险管理中的右尾","authors":"C. Smart","doi":"10.1080/1941658X.2012.734752","DOIUrl":null,"url":null,"abstract":"The “portfolio effect” is a common designation of a supposed reduction of cost risk achieved by funding multiple projects (the “portfolio”) that are not perfectly correlated with one another. It is often relied upon in setting confidence-level policy for program or organization budgets that are intended to fund multiple projects. The idea of a portfolio effect has its roots in modern finance, as pioneered by 1990 Nobel Memorial Prize in Economic Sciences recipient Harry Markowitz (1959). On the other hand, in presentations to four recent ISPA-SCEA conferences, 2007–2010, the present author argued that, when applied to Government budgeting, the portfolio effect is more myth than fact. However, current National Aeronautics and Space Administration and Department of Defense policy guidance relies heavily upon this apparently chimerical effect. The objective of the present article is to propose a superior alternative budgeting decision process based on a concept called “conditional tail expectation” that better measures project risk exposure in terms of the project's expected shortfall in funding. Also called “tail value at risk,” use of this risk-assessment technique is growing in popularity in a variety of financial contexts, including insurance.","PeriodicalId":390877,"journal":{"name":"Journal of Cost Analysis and Parametrics","volume":"11 suppl_1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":"{\"title\":\"Here, There Be Dragons: Considering the Right Tail in Risk Management\",\"authors\":\"C. Smart\",\"doi\":\"10.1080/1941658X.2012.734752\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The “portfolio effect” is a common designation of a supposed reduction of cost risk achieved by funding multiple projects (the “portfolio”) that are not perfectly correlated with one another. It is often relied upon in setting confidence-level policy for program or organization budgets that are intended to fund multiple projects. The idea of a portfolio effect has its roots in modern finance, as pioneered by 1990 Nobel Memorial Prize in Economic Sciences recipient Harry Markowitz (1959). On the other hand, in presentations to four recent ISPA-SCEA conferences, 2007–2010, the present author argued that, when applied to Government budgeting, the portfolio effect is more myth than fact. However, current National Aeronautics and Space Administration and Department of Defense policy guidance relies heavily upon this apparently chimerical effect. The objective of the present article is to propose a superior alternative budgeting decision process based on a concept called “conditional tail expectation” that better measures project risk exposure in terms of the project's expected shortfall in funding. Also called “tail value at risk,” use of this risk-assessment technique is growing in popularity in a variety of financial contexts, including insurance.\",\"PeriodicalId\":390877,\"journal\":{\"name\":\"Journal of Cost Analysis and Parametrics\",\"volume\":\"11 suppl_1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"8\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Cost Analysis and Parametrics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/1941658X.2012.734752\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Cost Analysis and Parametrics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/1941658X.2012.734752","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 8

摘要

“投资组合效应”是通过资助多个彼此不完全相关的项目(“投资组合”)来实现的假定的成本风险降低的一个常用名称。它通常依赖于为计划或组织预算设置信心水平政策,这些计划或组织预算旨在为多个项目提供资金。投资组合效应的概念源于现代金融,由1990年诺贝尔经济学奖获得者哈里•马科维茨(Harry Markowitz, 1959)首创。另一方面,在最近的四次ISPA-SCEA会议(2007-2010)的演讲中,本作者认为,当应用于政府预算时,投资组合效应更多的是神话而不是事实。然而,目前美国国家航空航天局和国防部的政策指导在很大程度上依赖于这种明显的幻觉效应。本文的目的是提出一种基于“条件尾期望”概念的更好的替代预算决策过程,该概念根据项目预期的资金短缺更好地衡量项目风险。这种风险评估技术也被称为“风险尾部价值”,在包括保险在内的各种金融环境中越来越受欢迎。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Here, There Be Dragons: Considering the Right Tail in Risk Management
The “portfolio effect” is a common designation of a supposed reduction of cost risk achieved by funding multiple projects (the “portfolio”) that are not perfectly correlated with one another. It is often relied upon in setting confidence-level policy for program or organization budgets that are intended to fund multiple projects. The idea of a portfolio effect has its roots in modern finance, as pioneered by 1990 Nobel Memorial Prize in Economic Sciences recipient Harry Markowitz (1959). On the other hand, in presentations to four recent ISPA-SCEA conferences, 2007–2010, the present author argued that, when applied to Government budgeting, the portfolio effect is more myth than fact. However, current National Aeronautics and Space Administration and Department of Defense policy guidance relies heavily upon this apparently chimerical effect. The objective of the present article is to propose a superior alternative budgeting decision process based on a concept called “conditional tail expectation” that better measures project risk exposure in terms of the project's expected shortfall in funding. Also called “tail value at risk,” use of this risk-assessment technique is growing in popularity in a variety of financial contexts, including insurance.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Editorial Board EOV Multiproduct Cost-Volume-Profit Model: A Resource Reallocation Approach for Decision Making Dynamics of New Building Construction Costs: Implications for Forecasting Escalation Allowances Balancing Expert Opinion and Historical Data: The Case of Baseball Umpires Using Robust Statistical Methodology to Evaluate the Cost Performance of Project Delivery Systems: A Case Study of Horizontal Construction
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1