{"title":"使用微处理器控制的正切三角桥和电源的高压绝缘自动测试","authors":"George A. Przybys","doi":"10.1109/EIC.1985.7458593","DOIUrl":null,"url":null,"abstract":"Insulation measurements on high voltage equipment are usually performed using a bridge method, comparing the specimen against a known standard. The measuring process involves adjusting the high voltage level, reading a nullindicator, balancing the bridge, transcribing the readings and eventually analyzing the data. This process has been completely automated by means of a micro-processor and a measuring system suitable for high voltage laboratories or assembly line testing is described in this paper.","PeriodicalId":188957,"journal":{"name":"1985 EIC 17th Electrical/Electronics Insulation Conference","volume":"84 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1985-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Automated testing of high voltage insulation using a micro-processor controlled tangent delta bridge and power supply\",\"authors\":\"George A. Przybys\",\"doi\":\"10.1109/EIC.1985.7458593\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Insulation measurements on high voltage equipment are usually performed using a bridge method, comparing the specimen against a known standard. The measuring process involves adjusting the high voltage level, reading a nullindicator, balancing the bridge, transcribing the readings and eventually analyzing the data. This process has been completely automated by means of a micro-processor and a measuring system suitable for high voltage laboratories or assembly line testing is described in this paper.\",\"PeriodicalId\":188957,\"journal\":{\"name\":\"1985 EIC 17th Electrical/Electronics Insulation Conference\",\"volume\":\"84 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1985-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"1985 EIC 17th Electrical/Electronics Insulation Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EIC.1985.7458593\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"1985 EIC 17th Electrical/Electronics Insulation Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EIC.1985.7458593","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Automated testing of high voltage insulation using a micro-processor controlled tangent delta bridge and power supply
Insulation measurements on high voltage equipment are usually performed using a bridge method, comparing the specimen against a known standard. The measuring process involves adjusting the high voltage level, reading a nullindicator, balancing the bridge, transcribing the readings and eventually analyzing the data. This process has been completely automated by means of a micro-processor and a measuring system suitable for high voltage laboratories or assembly line testing is described in this paper.