{"title":"中央区东辉煤矿11煤层机械化长壁生产排产图的改进","authors":"Hiep Hoang Do, Tung Manh Bui, D. Vu, Anh Tuan Tran","doi":"10.46326/jmes.2021.62(5a).08","DOIUrl":null,"url":null,"abstract":"The mechanization of longwall mining is an inevitable trend in underground coal industry. At present, Vietnam has operated many mechanized longwall faces in Quang Ninh coal field. The mechanised longwall at Seam 11, Centre area Duong Huy coal mine has been operated and its mechanised equipment complex basically performs as designed. However, the actual production shows that the longwall equipment has not reached its maximum capacity while the arrangement of production remains inadequate. Apart from objective factors, the initial production arrangement chart did not consider the maximization of the mechanised complex. In this paper, the authors used field observation and theoretical methods for improvement of production arrangement chart for the mechanised longwall at Seam 11, Duong Huy coal mine. An improved chart of production arrangement (and subsequently a chart of labour arrangement) has been developed based on actual time cost for each production task. According to the new chart, the production can be now implemented with 7 cuts per day - night. This arrangement well corresponds with practical production capacity that increases the longwall productivity.","PeriodicalId":170167,"journal":{"name":"Journal of Mining and Earth Sciences","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Improvement of production arrangement chart for mechanised longwall at Seam 11 of Centre area - Duong Huy coal mine\",\"authors\":\"Hiep Hoang Do, Tung Manh Bui, D. Vu, Anh Tuan Tran\",\"doi\":\"10.46326/jmes.2021.62(5a).08\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The mechanization of longwall mining is an inevitable trend in underground coal industry. At present, Vietnam has operated many mechanized longwall faces in Quang Ninh coal field. The mechanised longwall at Seam 11, Centre area Duong Huy coal mine has been operated and its mechanised equipment complex basically performs as designed. However, the actual production shows that the longwall equipment has not reached its maximum capacity while the arrangement of production remains inadequate. Apart from objective factors, the initial production arrangement chart did not consider the maximization of the mechanised complex. In this paper, the authors used field observation and theoretical methods for improvement of production arrangement chart for the mechanised longwall at Seam 11, Duong Huy coal mine. An improved chart of production arrangement (and subsequently a chart of labour arrangement) has been developed based on actual time cost for each production task. According to the new chart, the production can be now implemented with 7 cuts per day - night. This arrangement well corresponds with practical production capacity that increases the longwall productivity.\",\"PeriodicalId\":170167,\"journal\":{\"name\":\"Journal of Mining and Earth Sciences\",\"volume\":\"26 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Mining and Earth Sciences\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.46326/jmes.2021.62(5a).08\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Mining and Earth Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.46326/jmes.2021.62(5a).08","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

长壁开采机械化是煤矿井下工业发展的必然趋势。目前,越南已在广宁煤田开展了多个机械化长壁工作面的开采。东辉煤矿中部11煤层机械化长壁已投产,机械化设备群基本按设计运行。然而,实际生产表明,长壁设备并没有达到其最大产能,生产安排仍然不足。除了客观因素外,最初的生产安排图没有考虑机械化综合体的最大化。本文采用现场观察和理论方法,对东辉煤矿11煤层机械化长壁生产布置图进行了改进。根据每个生产任务的实际时间成本,改进了生产安排图表(以及随后的劳动力安排图表)。根据新的图表,生产现在可以实现7切割每天晚上。这种安排与实际生产能力相符合,提高了长壁产能。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Improvement of production arrangement chart for mechanised longwall at Seam 11 of Centre area - Duong Huy coal mine
The mechanization of longwall mining is an inevitable trend in underground coal industry. At present, Vietnam has operated many mechanized longwall faces in Quang Ninh coal field. The mechanised longwall at Seam 11, Centre area Duong Huy coal mine has been operated and its mechanised equipment complex basically performs as designed. However, the actual production shows that the longwall equipment has not reached its maximum capacity while the arrangement of production remains inadequate. Apart from objective factors, the initial production arrangement chart did not consider the maximization of the mechanised complex. In this paper, the authors used field observation and theoretical methods for improvement of production arrangement chart for the mechanised longwall at Seam 11, Duong Huy coal mine. An improved chart of production arrangement (and subsequently a chart of labour arrangement) has been developed based on actual time cost for each production task. According to the new chart, the production can be now implemented with 7 cuts per day - night. This arrangement well corresponds with practical production capacity that increases the longwall productivity.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
ESP Application for Oil Production in Naturally Fractured Granitic Basement Reservoir Comparison analytical hierarchy process (AHP) and frequency ratio (FR) method in assessment of landslide susceptibility. A case study in Van Yen district, Yen Bai province Deep geological structure of An Chau trough base on new study data Assessment of liquefaction potential of sand distributed in the 1 District, Ho Chi Minh city Geotechnical zoning in Hai Duong province for construction planning
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1