英国提供快速频率响应服务的电池存储系统的电压波动

S. Sommerville, G. Taylor, M. Abbod
{"title":"英国提供快速频率响应服务的电池存储系统的电压波动","authors":"S. Sommerville, G. Taylor, M. Abbod","doi":"10.1109/UPEC55022.2022.9917929","DOIUrl":null,"url":null,"abstract":"Within the UK there has been a significant increase in large scale Battery Energy Storage Systems (BESS) that provide services such as Fast Frequency Response (FFR) to National Grid ESO, for the GB system. At present, BESS units are installed by developers at substations with spare capacity, and their size and locations are not being centrally planned, and due to network connection costs, most developers are connecting the BESS units to the distribution network rather than to the transmission network. A concern has been identified that during FFR operation, multiple BESS units in an area would all operate nearly simultaneously, leading to large dynamic power swings in the systems creating problems for voltage Quality of Supply (QoS). This paper examines how the simultaneous operation of multiple BESS units in adjacent substations, can create adverse effects on the distribution system voltage that may not be apparent when considering operation of BESS units individually. The paper develops a simple test network which is representative of two substations on the Distribution Network in the UK; then uses DIgSILENT Powerfactory to examine the system voltage profile for BESS operation for several import-export and export-import cases.","PeriodicalId":371561,"journal":{"name":"2022 57th International Universities Power Engineering Conference (UPEC)","volume":"35 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-08-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Voltage Fluctuations of Battery Storage Systems Providing Fast Frequency Response Services in the UK\",\"authors\":\"S. Sommerville, G. Taylor, M. Abbod\",\"doi\":\"10.1109/UPEC55022.2022.9917929\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Within the UK there has been a significant increase in large scale Battery Energy Storage Systems (BESS) that provide services such as Fast Frequency Response (FFR) to National Grid ESO, for the GB system. At present, BESS units are installed by developers at substations with spare capacity, and their size and locations are not being centrally planned, and due to network connection costs, most developers are connecting the BESS units to the distribution network rather than to the transmission network. A concern has been identified that during FFR operation, multiple BESS units in an area would all operate nearly simultaneously, leading to large dynamic power swings in the systems creating problems for voltage Quality of Supply (QoS). This paper examines how the simultaneous operation of multiple BESS units in adjacent substations, can create adverse effects on the distribution system voltage that may not be apparent when considering operation of BESS units individually. The paper develops a simple test network which is representative of two substations on the Distribution Network in the UK; then uses DIgSILENT Powerfactory to examine the system voltage profile for BESS operation for several import-export and export-import cases.\",\"PeriodicalId\":371561,\"journal\":{\"name\":\"2022 57th International Universities Power Engineering Conference (UPEC)\",\"volume\":\"35 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-08-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2022 57th International Universities Power Engineering Conference (UPEC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/UPEC55022.2022.9917929\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 57th International Universities Power Engineering Conference (UPEC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/UPEC55022.2022.9917929","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在英国,为国家电网ESO提供快速频率响应(FFR)等服务的大型电池储能系统(BESS)显著增加。目前,BESS机组由开发商安装在有备用容量的变电站,其规模和位置没有进行集中规划,并且由于网络连接成本,大多数开发商将BESS机组连接到配电网而不是输电网。一个值得关注的问题是,在FFR运行期间,一个区域内的多个BESS单元几乎同时运行,导致系统中出现较大的动态功率波动,从而产生电压供应质量(QoS)问题。本文研究了相邻变电站中多个BESS单元同时运行如何对配电系统电压产生不利影响,当考虑BESS单元单独运行时,这种影响可能不明显。本文开发了一个简单的测试网络,代表了英国配电网的两个变电站;然后使用DIgSILENT Powerfactory检查BESS运行的几个进出口和进出口案例的系统电压分布。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Voltage Fluctuations of Battery Storage Systems Providing Fast Frequency Response Services in the UK
Within the UK there has been a significant increase in large scale Battery Energy Storage Systems (BESS) that provide services such as Fast Frequency Response (FFR) to National Grid ESO, for the GB system. At present, BESS units are installed by developers at substations with spare capacity, and their size and locations are not being centrally planned, and due to network connection costs, most developers are connecting the BESS units to the distribution network rather than to the transmission network. A concern has been identified that during FFR operation, multiple BESS units in an area would all operate nearly simultaneously, leading to large dynamic power swings in the systems creating problems for voltage Quality of Supply (QoS). This paper examines how the simultaneous operation of multiple BESS units in adjacent substations, can create adverse effects on the distribution system voltage that may not be apparent when considering operation of BESS units individually. The paper develops a simple test network which is representative of two substations on the Distribution Network in the UK; then uses DIgSILENT Powerfactory to examine the system voltage profile for BESS operation for several import-export and export-import cases.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
An Evaluation of Extending an Existing Substation Automation System using IEC 61850 Time Characteristic Curve Based Earth Fault Relay Selectivity Assessment for Optimal Overcurrent Relay Coordination in Distribution Networks Impact of the Photovoltaic Array Configuration on its Performance under Partial Shading Conditions The Impacts of The Temperature-Humidity Fluctuations in Substations and Practical Experimental Applications Synthesis and Characterization of Multi-level Pseudo-Random Sequences as Excitation Signals for System Identification
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1