{"title":"某复杂沙砾岩体地层浅埋隧道实例研究","authors":"Cheehwan Kim","doi":"10.7474/TUS.2015.25.3.244","DOIUrl":null,"url":null,"abstract":"Abstract The tunnel is excavated through the alluvial layer composed of sand and gravel with groundwater deposited on rock. A portion of upper part of the tunnel is located in the alluvial layer and there are several buildings just above the curved section of the tunnel. It is necessary to prevent from sand-flowing into the tunnel due to low strength of the alluvial, high groundwater level and shallow depth of the tunnel from the ground surface. For this, the alluvial around the tunnel is pre-reinforced by umbrella arch method with multi-stage grouting through large diameter steel pipes or jet grouting before excavating the tunnel. The effect of the pre-reinforcement of the tunnel and the safety of the buildings are monitored by measurement of ground deformation occurred during tunnelling. Key words Sand and gravel layer, Alluvial layer, Shallow tunnel, Multi stage grouting through large diameter steel pipe, Jet grouting초 록 모래와 자갈이 암반 위에 퇴적된 지층에서 터널의 윗부분이 지하수가 많은 모래자갈층을 통과하는 상황에서 터널을 시공하였다. 지상의 일부 곡선구간에 빌딩들도 있는 저심도 터널을 안전하게 시공하기 위하여 강도가 작고 지하수가 많은 터널천정부의 모래자갈이 터널 내로 낙하하는 유사현상 (sand flow)을 예방해야 하였다. 이를 위하여 대구경강관다단그라우팅이나 제트그라우팅으로 터널주변 충적층을 굴착 전에 미리 보강한 후 터널을 시공하였다. 이와 같이 터널을 보강한 효과와 지상빌딩의 안전을 시공 중 계측을 통하여 확인하였다 .핵심어 모래자갈층, 충적층, 저심도 터널, 대구경강관다단그라우팅, 제트그라우팅","PeriodicalId":437780,"journal":{"name":"Journal of Korean Society for Rock Mechanics","volume":"13 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-06-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Case Study of a Shallow Tunnelling Through Complex Strata of Sand-Gravel and Rock Mass\",\"authors\":\"Cheehwan Kim\",\"doi\":\"10.7474/TUS.2015.25.3.244\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract The tunnel is excavated through the alluvial layer composed of sand and gravel with groundwater deposited on rock. A portion of upper part of the tunnel is located in the alluvial layer and there are several buildings just above the curved section of the tunnel. It is necessary to prevent from sand-flowing into the tunnel due to low strength of the alluvial, high groundwater level and shallow depth of the tunnel from the ground surface. For this, the alluvial around the tunnel is pre-reinforced by umbrella arch method with multi-stage grouting through large diameter steel pipes or jet grouting before excavating the tunnel. The effect of the pre-reinforcement of the tunnel and the safety of the buildings are monitored by measurement of ground deformation occurred during tunnelling. Key words Sand and gravel layer, Alluvial layer, Shallow tunnel, Multi stage grouting through large diameter steel pipe, Jet grouting초 록 모래와 자갈이 암반 위에 퇴적된 지층에서 터널의 윗부분이 지하수가 많은 모래자갈층을 통과하는 상황에서 터널을 시공하였다. 지상의 일부 곡선구간에 빌딩들도 있는 저심도 터널을 안전하게 시공하기 위하여 강도가 작고 지하수가 많은 터널천정부의 모래자갈이 터널 내로 낙하하는 유사현상 (sand flow)을 예방해야 하였다. 이를 위하여 대구경강관다단그라우팅이나 제트그라우팅으로 터널주변 충적층을 굴착 전에 미리 보강한 후 터널을 시공하였다. 이와 같이 터널을 보강한 효과와 지상빌딩의 안전을 시공 중 계측을 통하여 확인하였다 .핵심어 모래자갈층, 충적층, 저심도 터널, 대구경강관다단그라우팅, 제트그라우팅\",\"PeriodicalId\":437780,\"journal\":{\"name\":\"Journal of Korean Society for Rock Mechanics\",\"volume\":\"13 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-06-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Korean Society for Rock Mechanics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.7474/TUS.2015.25.3.244\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Korean Society for Rock Mechanics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.7474/TUS.2015.25.3.244","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

摘要隧道是在由砂砾组成的冲积层中开挖的,地下水沉积在岩石上。隧道上部部分位于冲积层中,隧道弯曲段上方有几座建筑物。由于冲积物强度低,地下水位高,隧道离地面深度浅,有必要防止砂石流入隧道。为此,隧道开挖前对隧道周围冲积层采用伞拱法进行预加固,采用大直径钢管进行多级注浆或喷射注浆。通过测量隧道开挖过程中的地面变形,监测隧道预加固效果和建筑物的安全性。关键词砂砾层,冲积层,浅隧道,大直径钢管多级注浆,喷射注浆,大直径钢管,大直径钢管,大直径钢管,大直径钢管,大直径钢管,大直径钢管,大直径钢管,大直径钢管,大直径钢管,大直径钢管지상의일부곡선구간에빌딩들도있는저심도터널을안전하게시공하기위하여강도가작고지하수가많은터널천정부의모래자갈이터널내로낙하하는유사현상(砂流)을예방해야하였다。이를위하여대구경강관다단그라우팅이나제트그라우팅으로터널주변충적층을굴착전에미리보강한후터널을시공하였다。이와같이터널을보강한효과와지상빌딩의안전을시공중계측을통하여확인하였다。핵심어모래자갈층,충적층,저심도터널,대구경강관다단그라우팅,제트그라우팅
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Case Study of a Shallow Tunnelling Through Complex Strata of Sand-Gravel and Rock Mass
Abstract The tunnel is excavated through the alluvial layer composed of sand and gravel with groundwater deposited on rock. A portion of upper part of the tunnel is located in the alluvial layer and there are several buildings just above the curved section of the tunnel. It is necessary to prevent from sand-flowing into the tunnel due to low strength of the alluvial, high groundwater level and shallow depth of the tunnel from the ground surface. For this, the alluvial around the tunnel is pre-reinforced by umbrella arch method with multi-stage grouting through large diameter steel pipes or jet grouting before excavating the tunnel. The effect of the pre-reinforcement of the tunnel and the safety of the buildings are monitored by measurement of ground deformation occurred during tunnelling. Key words Sand and gravel layer, Alluvial layer, Shallow tunnel, Multi stage grouting through large diameter steel pipe, Jet grouting초 록 모래와 자갈이 암반 위에 퇴적된 지층에서 터널의 윗부분이 지하수가 많은 모래자갈층을 통과하는 상황에서 터널을 시공하였다. 지상의 일부 곡선구간에 빌딩들도 있는 저심도 터널을 안전하게 시공하기 위하여 강도가 작고 지하수가 많은 터널천정부의 모래자갈이 터널 내로 낙하하는 유사현상 (sand flow)을 예방해야 하였다. 이를 위하여 대구경강관다단그라우팅이나 제트그라우팅으로 터널주변 충적층을 굴착 전에 미리 보강한 후 터널을 시공하였다. 이와 같이 터널을 보강한 효과와 지상빌딩의 안전을 시공 중 계측을 통하여 확인하였다 .핵심어 모래자갈층, 충적층, 저심도 터널, 대구경강관다단그라우팅, 제트그라우팅
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Development of a Low Pressure Auxiliary Fan for Local Large-opening Limestone Mines Performance Evaluation of Conical Picks for Roadheader in Copper Mines Development of an Optimized Prediction System of Round Trip Occurrence using Genetic Algorithm Study on the Convergence of the NATM Tunnel Constructed in the Weathered Granite THM Coupling Analysis for Decovalex-2015 Task B2
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1