Mehedi Hasan Jewel, Md. Suruj Ali, S. Aziz, Parag Kumar Paul, Md. Nur Alam, S. Chowdhury
{"title":"基于优先级的负荷管理系统的开发,以解决国家电网可再生能源电力注入的可变性","authors":"Mehedi Hasan Jewel, Md. Suruj Ali, S. Aziz, Parag Kumar Paul, Md. Nur Alam, S. Chowdhury","doi":"10.1109/ICDRET54330.2021.9752677","DOIUrl":null,"url":null,"abstract":"Variable renewable energy injection into the grid makes the smooth operation of the grid challenging. Demand response enabled smart grid addresses the challenges by managing demand. This work developed a priority based load control system that controls the demand by switching the loads according to the priority depending on grid parameters like voltage and frequency. A laboratory setup has been developed along with a smart meter that can measure the grid voltage and frequency. By measuring the grid voltage and frequency, the device can switch off or on the connected priority loads.","PeriodicalId":211114,"journal":{"name":"2021 6th International Conference on Development in Renewable Energy Technology (ICDRET)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-12-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Development of a Priority-based Load Management System to Address Variability in RE Power Injection in National Grid\",\"authors\":\"Mehedi Hasan Jewel, Md. Suruj Ali, S. Aziz, Parag Kumar Paul, Md. Nur Alam, S. Chowdhury\",\"doi\":\"10.1109/ICDRET54330.2021.9752677\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Variable renewable energy injection into the grid makes the smooth operation of the grid challenging. Demand response enabled smart grid addresses the challenges by managing demand. This work developed a priority based load control system that controls the demand by switching the loads according to the priority depending on grid parameters like voltage and frequency. A laboratory setup has been developed along with a smart meter that can measure the grid voltage and frequency. By measuring the grid voltage and frequency, the device can switch off or on the connected priority loads.\",\"PeriodicalId\":211114,\"journal\":{\"name\":\"2021 6th International Conference on Development in Renewable Energy Technology (ICDRET)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-12-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 6th International Conference on Development in Renewable Energy Technology (ICDRET)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICDRET54330.2021.9752677\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 6th International Conference on Development in Renewable Energy Technology (ICDRET)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICDRET54330.2021.9752677","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Development of a Priority-based Load Management System to Address Variability in RE Power Injection in National Grid
Variable renewable energy injection into the grid makes the smooth operation of the grid challenging. Demand response enabled smart grid addresses the challenges by managing demand. This work developed a priority based load control system that controls the demand by switching the loads according to the priority depending on grid parameters like voltage and frequency. A laboratory setup has been developed along with a smart meter that can measure the grid voltage and frequency. By measuring the grid voltage and frequency, the device can switch off or on the connected priority loads.