J. Quirós-Tortós, G. Valverde, L. Ding, V. Terzija
{"title":"相量测量单元的优化配置以提高并联电力系统的恢复","authors":"J. Quirós-Tortós, G. Valverde, L. Ding, V. Terzija","doi":"10.1109/ISGTEurope.2011.6162687","DOIUrl":null,"url":null,"abstract":"This paper proposes a new method for optimal placement of Phasor Measurement Units (PMUs) across the weak areas of the power system to monitor the status of the boundary buses during Parallel Power System Restoration (PPSR). The proposed PMU placement method is based on an Integer Linear Programming (ILP) methodology. For validation purposes, the proposed method is implemented across the weak areas of the following two test systems: New England 39-bus test system and IEEE 118-bus test system.","PeriodicalId":419250,"journal":{"name":"2011 2nd IEEE PES International Conference and Exhibition on Innovative Smart Grid Technologies","volume":"41 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":"{\"title\":\"Optimal placement of Phasor Measurement Units to Improve Parallel Power System Restoration\",\"authors\":\"J. Quirós-Tortós, G. Valverde, L. Ding, V. Terzija\",\"doi\":\"10.1109/ISGTEurope.2011.6162687\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper proposes a new method for optimal placement of Phasor Measurement Units (PMUs) across the weak areas of the power system to monitor the status of the boundary buses during Parallel Power System Restoration (PPSR). The proposed PMU placement method is based on an Integer Linear Programming (ILP) methodology. For validation purposes, the proposed method is implemented across the weak areas of the following two test systems: New England 39-bus test system and IEEE 118-bus test system.\",\"PeriodicalId\":419250,\"journal\":{\"name\":\"2011 2nd IEEE PES International Conference and Exhibition on Innovative Smart Grid Technologies\",\"volume\":\"41 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"8\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 2nd IEEE PES International Conference and Exhibition on Innovative Smart Grid Technologies\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISGTEurope.2011.6162687\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 2nd IEEE PES International Conference and Exhibition on Innovative Smart Grid Technologies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISGTEurope.2011.6162687","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Optimal placement of Phasor Measurement Units to Improve Parallel Power System Restoration
This paper proposes a new method for optimal placement of Phasor Measurement Units (PMUs) across the weak areas of the power system to monitor the status of the boundary buses during Parallel Power System Restoration (PPSR). The proposed PMU placement method is based on an Integer Linear Programming (ILP) methodology. For validation purposes, the proposed method is implemented across the weak areas of the following two test systems: New England 39-bus test system and IEEE 118-bus test system.