{"title":"海上平台维护计划","authors":"P. Costa, F. Duarte, P. Béguin","doi":"10.5965/2316796310202021154","DOIUrl":null,"url":null,"abstract":"\nWithin the scope of industrial megaprojects, such as a large-scale maintenance campaign for an oil platform, planning for tasks that will be executed in highly dynamic environments – defined by variability, uncertainty, and unforeseen events – is a challenging job. The Ergonomic Work Analysis (EWA) by the maintenance planning technicians showed that, despite the different strategies in use, there are limits in the possibility of predicting a future context. Thus, planning is a collective process of reducing uncertainty, but it requires instrumentalization of the players involved therewith. \n","PeriodicalId":398171,"journal":{"name":"Human Factors in Design","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-12-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Planning of an offshore platform maintenance campaign\",\"authors\":\"P. Costa, F. Duarte, P. Béguin\",\"doi\":\"10.5965/2316796310202021154\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\nWithin the scope of industrial megaprojects, such as a large-scale maintenance campaign for an oil platform, planning for tasks that will be executed in highly dynamic environments – defined by variability, uncertainty, and unforeseen events – is a challenging job. The Ergonomic Work Analysis (EWA) by the maintenance planning technicians showed that, despite the different strategies in use, there are limits in the possibility of predicting a future context. Thus, planning is a collective process of reducing uncertainty, but it requires instrumentalization of the players involved therewith. \\n\",\"PeriodicalId\":398171,\"journal\":{\"name\":\"Human Factors in Design\",\"volume\":\"12 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-12-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Human Factors in Design\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5965/2316796310202021154\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Human Factors in Design","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5965/2316796310202021154","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Planning of an offshore platform maintenance campaign
Within the scope of industrial megaprojects, such as a large-scale maintenance campaign for an oil platform, planning for tasks that will be executed in highly dynamic environments – defined by variability, uncertainty, and unforeseen events – is a challenging job. The Ergonomic Work Analysis (EWA) by the maintenance planning technicians showed that, despite the different strategies in use, there are limits in the possibility of predicting a future context. Thus, planning is a collective process of reducing uncertainty, but it requires instrumentalization of the players involved therewith.