{"title":"DERMS部署的测试挑战和方法","authors":"Syed Qaseem Ali, Shadi Chuangpishit, F. Katiraei, Chad S. Abbey, Samrat Datta","doi":"10.1109/GridEdge54130.2023.10102746","DOIUrl":null,"url":null,"abstract":"Distributed Energy Resources Management Systems (DERMS) are increasingly becoming a need for many utilities to manage DERs on their networks. DERMS deployment includes a variety of actors arranged in varying architectures, communicating with each other employing various protocols. With the complexity around DERMS deployment rigorous testing is required at various stages of the deployment to ensure correct functionality. This paper presents the various architectures for DERMS deployment, presents its testing requirements, and discusses the available methods and tools to meet the testing requirements. Finally, two case studies are presented where two different kinds of testbeds were used to meet the clients DERMS testing requirements.","PeriodicalId":377998,"journal":{"name":"2023 IEEE PES Grid Edge Technologies Conference & Exposition (Grid Edge)","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-04-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Testing Challenges and Approaches for DERMS Deployment\",\"authors\":\"Syed Qaseem Ali, Shadi Chuangpishit, F. Katiraei, Chad S. Abbey, Samrat Datta\",\"doi\":\"10.1109/GridEdge54130.2023.10102746\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Distributed Energy Resources Management Systems (DERMS) are increasingly becoming a need for many utilities to manage DERs on their networks. DERMS deployment includes a variety of actors arranged in varying architectures, communicating with each other employing various protocols. With the complexity around DERMS deployment rigorous testing is required at various stages of the deployment to ensure correct functionality. This paper presents the various architectures for DERMS deployment, presents its testing requirements, and discusses the available methods and tools to meet the testing requirements. Finally, two case studies are presented where two different kinds of testbeds were used to meet the clients DERMS testing requirements.\",\"PeriodicalId\":377998,\"journal\":{\"name\":\"2023 IEEE PES Grid Edge Technologies Conference & Exposition (Grid Edge)\",\"volume\":\"12 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-04-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2023 IEEE PES Grid Edge Technologies Conference & Exposition (Grid Edge)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/GridEdge54130.2023.10102746\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2023 IEEE PES Grid Edge Technologies Conference & Exposition (Grid Edge)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/GridEdge54130.2023.10102746","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

分布式能源管理系统(DERMS)日益成为许多公用事业公司管理其网络上的der的需求。DERMS部署包括安排在不同体系结构中的各种参与者,它们使用各种协议相互通信。由于DERMS部署的复杂性,需要在部署的各个阶段进行严格的测试,以确保正确的功能。本文介绍了用于DERMS部署的各种体系结构,提出了其测试需求,并讨论了满足测试需求的可用方法和工具。最后,给出了两个案例研究,其中使用了两种不同类型的试验台来满足客户的DERMS测试需求。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Testing Challenges and Approaches for DERMS Deployment
Distributed Energy Resources Management Systems (DERMS) are increasingly becoming a need for many utilities to manage DERs on their networks. DERMS deployment includes a variety of actors arranged in varying architectures, communicating with each other employing various protocols. With the complexity around DERMS deployment rigorous testing is required at various stages of the deployment to ensure correct functionality. This paper presents the various architectures for DERMS deployment, presents its testing requirements, and discusses the available methods and tools to meet the testing requirements. Finally, two case studies are presented where two different kinds of testbeds were used to meet the clients DERMS testing requirements.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Adaptive approach for primary frequency support by wind turbines based on grid code requirements and turbines limitations Steady State Voltage Regulation Requirements for Grid-Forming Inverter based Power Plant in Microgrid Applications Energy Management of Ultra Fast Charging Stations Parallel Line Resonance Between Interagency Transmission Lines and the Effect on a De-Energized Line with Fixed Shunt Reactance Estimating the Output of Behind the Meter Solar Farms by Breaking Irradiance Data into its Diffuse and Direct Components
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1