{"title":"当使用CUSUM控制图时,找到真正的变化点","authors":"M. E. D. Monfared, Fazlollah Lak","doi":"10.29252/JSRI.15.1.99","DOIUrl":null,"url":null,"abstract":"In this paper, it is assumed that the mean of a normal process is monitored by a CUSUM control chart. When the control chart triggers a signal and declares that the process has gone out of control, a search process is started to find the time of change and the causes of going the process out of control. Several methods (plans) for finding the true (real) change point is proposed. It is shown that the plans which are based on the likelihood of the points in time perform better.","PeriodicalId":422124,"journal":{"name":"Journal of Statistical Research of Iran","volume":"248 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Finding True Change Point When a CUSUM Control Chart is Used\",\"authors\":\"M. E. D. Monfared, Fazlollah Lak\",\"doi\":\"10.29252/JSRI.15.1.99\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, it is assumed that the mean of a normal process is monitored by a CUSUM control chart. When the control chart triggers a signal and declares that the process has gone out of control, a search process is started to find the time of change and the causes of going the process out of control. Several methods (plans) for finding the true (real) change point is proposed. It is shown that the plans which are based on the likelihood of the points in time perform better.\",\"PeriodicalId\":422124,\"journal\":{\"name\":\"Journal of Statistical Research of Iran\",\"volume\":\"248 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Statistical Research of Iran\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.29252/JSRI.15.1.99\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Statistical Research of Iran","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29252/JSRI.15.1.99","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Finding True Change Point When a CUSUM Control Chart is Used
In this paper, it is assumed that the mean of a normal process is monitored by a CUSUM control chart. When the control chart triggers a signal and declares that the process has gone out of control, a search process is started to find the time of change and the causes of going the process out of control. Several methods (plans) for finding the true (real) change point is proposed. It is shown that the plans which are based on the likelihood of the points in time perform better.