无聊过程中电子学习的增强利用知识管理成熟度

Zulma Luklu Il Maqnun, Fadel Muhammad, A. Kurniawati, M. T. Kurniawan
{"title":"无聊过程中电子学习的增强利用知识管理成熟度","authors":"Zulma Luklu Il Maqnun, Fadel Muhammad, A. Kurniawati, M. T. Kurniawan","doi":"10.1109/IEEM45057.2020.9309815","DOIUrl":null,"url":null,"abstract":"To catch up with the dynamics of business needs, organizations need to maintain and regularly enhance the performance of their information system and human capital. An aerospace industry company is expected to have a sustainable implementation of knowledge-based e-learning. The company needed to enhance the e-learning that covers the entire content of the boring process. This study aimed to design the enhancement of e-learning of the boring process and to review the company’s KM maturity. The knowledge conversion process retrieved thirty-one tacit knowledge and converted them as part of best practice and the knowledge content of e-learning. Afterward, the software development process was commenced to develop the adjustment of the e-learning structure and new features required. The review showed e-learning has contributed to the company’s KM maturity on level 3 – Aware. By evaluating the KM maturity, the company can determine the initiatives improvements needed to leverage the KM practice.","PeriodicalId":226426,"journal":{"name":"2020 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2020-12-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"The Enhancement of E-learning for the Boring Process to Leverage the Knowledge Management Maturity\",\"authors\":\"Zulma Luklu Il Maqnun, Fadel Muhammad, A. Kurniawati, M. T. Kurniawan\",\"doi\":\"10.1109/IEEM45057.2020.9309815\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"To catch up with the dynamics of business needs, organizations need to maintain and regularly enhance the performance of their information system and human capital. An aerospace industry company is expected to have a sustainable implementation of knowledge-based e-learning. The company needed to enhance the e-learning that covers the entire content of the boring process. This study aimed to design the enhancement of e-learning of the boring process and to review the company’s KM maturity. The knowledge conversion process retrieved thirty-one tacit knowledge and converted them as part of best practice and the knowledge content of e-learning. Afterward, the software development process was commenced to develop the adjustment of the e-learning structure and new features required. The review showed e-learning has contributed to the company’s KM maturity on level 3 – Aware. By evaluating the KM maturity, the company can determine the initiatives improvements needed to leverage the KM practice.\",\"PeriodicalId\":226426,\"journal\":{\"name\":\"2020 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-12-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2020 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IEEM45057.2020.9309815\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEM45057.2020.9309815","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

为了跟上业务需求的动态变化,组织需要维护并定期提高其信息系统和人力资本的性能。期望航空航天工业公司可持续地实施基于知识的电子学习。公司需要加强电子学习,以涵盖枯燥过程的全部内容。本研究旨在设计提升无聊过程的电子学习,并检视公司的知识管理成熟度。知识转换过程检索31项隐性知识,并将其转换为电子学习最佳实践和知识内容的一部分。然后,开始软件开发过程,开发电子学习结构的调整和所需的新功能。审查表明,电子学习对公司的知识管理成熟度在3级意识上做出了贡献。通过评估知识管理成熟度,公司可以确定利用知识管理实践所需的主动性改进。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
The Enhancement of E-learning for the Boring Process to Leverage the Knowledge Management Maturity
To catch up with the dynamics of business needs, organizations need to maintain and regularly enhance the performance of their information system and human capital. An aerospace industry company is expected to have a sustainable implementation of knowledge-based e-learning. The company needed to enhance the e-learning that covers the entire content of the boring process. This study aimed to design the enhancement of e-learning of the boring process and to review the company’s KM maturity. The knowledge conversion process retrieved thirty-one tacit knowledge and converted them as part of best practice and the knowledge content of e-learning. Afterward, the software development process was commenced to develop the adjustment of the e-learning structure and new features required. The review showed e-learning has contributed to the company’s KM maturity on level 3 – Aware. By evaluating the KM maturity, the company can determine the initiatives improvements needed to leverage the KM practice.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
An Inventory Optimization Model Under Demand Uncertainty for Autonomous Multi-site Inventory Planning with Material Substitutability and Transshipment Sustainability Assessment of Contract Farming Broiler Chicken Supply Chain Using Rap-Poultry Concept Design of a System Architecture for a Manufacturing Cyber-physical Digital Twin System Robust Optimization Based Heuristic Approach for Solving Stochastic Multi-Mode Resource Constrained Project Scheduling Problem Bi-objective Multistage Decentralized Supply Chain Planning
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1