四川盆地页岩气最富区有何启示?

Meng Wang, Ming-guang Che, Yun Jiang, Chunming He, Dingwei Weng, G. Zhu
{"title":"四川盆地页岩气最富区有何启示?","authors":"Meng Wang, Ming-guang Che, Yun Jiang, Chunming He, Dingwei Weng, G. Zhu","doi":"10.2118/209703-ms","DOIUrl":null,"url":null,"abstract":"\n There are more than 1300 horizontal wells in the Sichuan Basin shale reservoirsthat produce more than 20 billion cubic meters of gas in 2021. A test production of best-performing shale gas pad,so far in China, consisting of 8 horizontal wells, is over 4.7 × 106 m³/d (167.7 MMcf/d). The average EUR per well is estimated to exceed 2.0 × 108 m³(7.0 bcf).The underlying geological controlling factors including TOC content, porosity, gas saturation and brittle mineral content for these prolific wells were analyzed. The length of the well laterals drilling into the sweetest pay zone was characterized by well logging. The strategies of optimizing drilling and completion strategies used in these wells are discussed. In addition, the solutions to deal with the frequent occurrence of casing deformation are also proposed and adopted. Rate transient analysis was performed on these wells to assess the stimulation efficiency, which was further compared with those wells treated by conventional stimulationstrategies. It was found that the thickness and length of the completion in the highest quality pay zone are the two main geological controlling factors for the prolific wells. Different from the conventional stimulation strategies, the eight wells in one pad were all treated using higher intensity stimulation strategies. The average spacing between treated stages ranges from 85 m to 91 m, with tighter cluster spacing. Fracturing was temporarily plugged to passively treat sever deformation in two laterals consisting of 29 stages (total length of 2068m). Compared with the neighboring offset wells, the average bulk linear flow parameter of these eight well is 72% higher. Integration of geological designs (like sweet spot optimization) and engineering designs (such as tighter cluster spacing within longer stages, temporarily plugging fracturingand using more proppants), created a high-productivity template for the next stage of efficient developments of shale gas. The findings obtained in this study are also beneficial to unlock unconventional resources including shale oil and tight gas in China.","PeriodicalId":148855,"journal":{"name":"Day 4 Thu, June 09, 2022","volume":"65 6","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-06-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"What Have We Learn from the Most Prolific Pad of Shale Gas in the Sichuan Basin?\",\"authors\":\"Meng Wang, Ming-guang Che, Yun Jiang, Chunming He, Dingwei Weng, G. Zhu\",\"doi\":\"10.2118/209703-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n There are more than 1300 horizontal wells in the Sichuan Basin shale reservoirsthat produce more than 20 billion cubic meters of gas in 2021. A test production of best-performing shale gas pad,so far in China, consisting of 8 horizontal wells, is over 4.7 × 106 m³/d (167.7 MMcf/d). The average EUR per well is estimated to exceed 2.0 × 108 m³(7.0 bcf).The underlying geological controlling factors including TOC content, porosity, gas saturation and brittle mineral content for these prolific wells were analyzed. The length of the well laterals drilling into the sweetest pay zone was characterized by well logging. The strategies of optimizing drilling and completion strategies used in these wells are discussed. In addition, the solutions to deal with the frequent occurrence of casing deformation are also proposed and adopted. Rate transient analysis was performed on these wells to assess the stimulation efficiency, which was further compared with those wells treated by conventional stimulationstrategies. It was found that the thickness and length of the completion in the highest quality pay zone are the two main geological controlling factors for the prolific wells. Different from the conventional stimulation strategies, the eight wells in one pad were all treated using higher intensity stimulation strategies. The average spacing between treated stages ranges from 85 m to 91 m, with tighter cluster spacing. Fracturing was temporarily plugged to passively treat sever deformation in two laterals consisting of 29 stages (total length of 2068m). Compared with the neighboring offset wells, the average bulk linear flow parameter of these eight well is 72% higher. Integration of geological designs (like sweet spot optimization) and engineering designs (such as tighter cluster spacing within longer stages, temporarily plugging fracturingand using more proppants), created a high-productivity template for the next stage of efficient developments of shale gas. The findings obtained in this study are also beneficial to unlock unconventional resources including shale oil and tight gas in China.\",\"PeriodicalId\":148855,\"journal\":{\"name\":\"Day 4 Thu, June 09, 2022\",\"volume\":\"65 6\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-06-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 4 Thu, June 09, 2022\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/209703-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 4 Thu, June 09, 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/209703-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

四川盆地页岩储层有1300多口水平井,2021年天然气产量将超过200亿立方米。迄今为止,中国最好的页岩气区块的测试产量超过4.7 × 106 m³/d (167.7 MMcf/d),由8口水平井组成。每口井的平均成本估计超过2.0 × 108 m³(7.0亿立方英尺)。分析了这些高产井TOC含量、孔隙度、含气饱和度、脆性矿物含量等潜在地质控制因素。通过测井对钻入最甜产层的水平段长度进行了表征。讨论了该类井的钻完井优化策略。此外,针对套管频繁发生的变形,提出并采用了相应的解决方案。对这些井进行了速率瞬态分析,以评估增产效果,并进一步与采用常规增产策略的井进行了比较。研究发现,高质量产层完井厚度和完井长度是影响高产井的两个主要地质控制因素。与常规增产措施不同,同一区块的8口井均采用了更高强度的增产措施。处理段之间的平均间距为85 ~ 91 m,簇间距更小。在29段(总长度2068m)的两个分支中,临时封堵压裂以被动处理严重变形。与邻井相比,这8口井的平均整体线性流量参数提高了72%。整合地质设计(如甜点优化)和工程设计(如在较长的压裂段内更紧凑的簇间距、临时封堵裂缝和使用更多支撑剂),为下一阶段页岩气的高效开发创造了一个高产能模板。研究结果也有利于中国页岩油、致密气等非常规油气资源的开发。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
What Have We Learn from the Most Prolific Pad of Shale Gas in the Sichuan Basin?
There are more than 1300 horizontal wells in the Sichuan Basin shale reservoirsthat produce more than 20 billion cubic meters of gas in 2021. A test production of best-performing shale gas pad,so far in China, consisting of 8 horizontal wells, is over 4.7 × 106 m³/d (167.7 MMcf/d). The average EUR per well is estimated to exceed 2.0 × 108 m³(7.0 bcf).The underlying geological controlling factors including TOC content, porosity, gas saturation and brittle mineral content for these prolific wells were analyzed. The length of the well laterals drilling into the sweetest pay zone was characterized by well logging. The strategies of optimizing drilling and completion strategies used in these wells are discussed. In addition, the solutions to deal with the frequent occurrence of casing deformation are also proposed and adopted. Rate transient analysis was performed on these wells to assess the stimulation efficiency, which was further compared with those wells treated by conventional stimulationstrategies. It was found that the thickness and length of the completion in the highest quality pay zone are the two main geological controlling factors for the prolific wells. Different from the conventional stimulation strategies, the eight wells in one pad were all treated using higher intensity stimulation strategies. The average spacing between treated stages ranges from 85 m to 91 m, with tighter cluster spacing. Fracturing was temporarily plugged to passively treat sever deformation in two laterals consisting of 29 stages (total length of 2068m). Compared with the neighboring offset wells, the average bulk linear flow parameter of these eight well is 72% higher. Integration of geological designs (like sweet spot optimization) and engineering designs (such as tighter cluster spacing within longer stages, temporarily plugging fracturingand using more proppants), created a high-productivity template for the next stage of efficient developments of shale gas. The findings obtained in this study are also beneficial to unlock unconventional resources including shale oil and tight gas in China.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Designing CO2-EOR in Indonesia by Matching Business Strategy: Study Case East Java Field, Indonesia A Deep-Learning-Based Approach for Production Forecast and Reservoir Evaluation for Shale Gas Wells with Complex Fracture Networks Oil Recovery by Low-Rate Waterflooding in Water-Wet Sandstone Cores A Universal Method for Predicting the Relative Permeability Data of Low Salinity Injection Investigation and Simulation of SWAG injections Performed in Mixed-Wet Carbonate Rocks.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1