{"title":"专用DFR的回归是IEC 61850过程总线如何简化DFR的安装","authors":"R. Hunt, L. B. de Oliveira","doi":"10.1049/JOE.2018.0240","DOIUrl":null,"url":null,"abstract":"The advantages of a dedicated, standalone DFR are well known: natively synchronized fault records, large record storage capabilities, high sampling rates, numerous types of triggers, and large numbers of analog and digital recording channels. The main disadvantage to the dedicated DFR is cost: a dedicated DFR must be directly wired to every current, voltage, and status point, resulting in an installed project cost easily 10 times the material cost of the DFR itself. For this reason, electric utilities have been moving away from dedicated, standalone DFRs.","PeriodicalId":285875,"journal":{"name":"2018 71st Annual Conference for Protective Relay Engineers (CPRE)","volume":"33 2","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The return of the dedicated DFR how IEC 61850 process bus simplifies DFR installation\",\"authors\":\"R. Hunt, L. B. de Oliveira\",\"doi\":\"10.1049/JOE.2018.0240\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The advantages of a dedicated, standalone DFR are well known: natively synchronized fault records, large record storage capabilities, high sampling rates, numerous types of triggers, and large numbers of analog and digital recording channels. The main disadvantage to the dedicated DFR is cost: a dedicated DFR must be directly wired to every current, voltage, and status point, resulting in an installed project cost easily 10 times the material cost of the DFR itself. For this reason, electric utilities have been moving away from dedicated, standalone DFRs.\",\"PeriodicalId\":285875,\"journal\":{\"name\":\"2018 71st Annual Conference for Protective Relay Engineers (CPRE)\",\"volume\":\"33 2\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 71st Annual Conference for Protective Relay Engineers (CPRE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1049/JOE.2018.0240\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 71st Annual Conference for Protective Relay Engineers (CPRE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1049/JOE.2018.0240","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

一个专用的、独立的DFR的优点是众所周知的:本地同步的故障记录,大的记录存储能力,高采样率,多种类型的触发器,以及大量的模拟和数字记录通道。专用DFR的主要缺点是成本:专用DFR必须直接连接到每个电流、电压和状态点,导致安装项目的成本很容易是DFR本身材料成本的10倍。出于这个原因,电力公司一直在远离专用的、独立的dfr。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
The return of the dedicated DFR how IEC 61850 process bus simplifies DFR installation
The advantages of a dedicated, standalone DFR are well known: natively synchronized fault records, large record storage capabilities, high sampling rates, numerous types of triggers, and large numbers of analog and digital recording channels. The main disadvantage to the dedicated DFR is cost: a dedicated DFR must be directly wired to every current, voltage, and status point, resulting in an installed project cost easily 10 times the material cost of the DFR itself. For this reason, electric utilities have been moving away from dedicated, standalone DFRs.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Correlating protective relay reports for system-wide, post-event analysis Back to the basics — Event analysis using symmetrical components Cyber security — Securing the protection and control relay communication in substation Communications assisted islanding detection: Contrasting direct transfer trip and phase comparison methods Applying intelligent fast load shed using IEC 61850 GOOSE
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1