{"title":"影响工程造价估算的因素。","authors":"Amna Omar, Neama Omar","doi":"10.21608/fuje.2022.168316.1027","DOIUrl":null,"url":null,"abstract":"A construction project's success depends on its planning, accurate cost estimating is critical in both public and private enterprises. Public building projects in Saudi Arabia have been plagued by enormous overruns and delays over the previous three decades due to poor construction performance. The purpose of the research is determining the most critical factors affecting the accuracy of Saudi Arabian public project construction cost estimates. A questionnaire survey was given to 100 participants at random,95 of whom were males and 5 of whom were women, in order to acquire data. Cost estimates for Saudi public building projects are affected by financial concerns, the bidding situation and project features, as well as the estimation technique. The results found that the main factor related to financial issues. And the most significant factors of financial issues, which affecting cost estimates are financial status of client market, the unstable economic situation, cost estimation accuracy, financial resource availability, punctuality of cost flow as well as the availability of high-quality financial plans and accurate estimation. Besides, the most significant factors of bidding situation, which affecting cost estimates are designer and design quality, com-pany's strength and reputation in the construction industry, and amount of experience on such projects. Furthermore, the most significant factors of project characteristics, which affecting cost estimates are project manager competence, owners' requirement, Project specification and requirement, as well as project duration. Finally, the most significant factors of estimating process, which affecting cost estimates are project team's experience, time allowed for preparing estimates and availability of cost indices.","PeriodicalId":267155,"journal":{"name":"Fayoum University Journal of Engineering","volume":"78 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Factors Affecting Construction Projects’ Cost Estimating.\",\"authors\":\"Amna Omar, Neama Omar\",\"doi\":\"10.21608/fuje.2022.168316.1027\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A construction project's success depends on its planning, accurate cost estimating is critical in both public and private enterprises. Public building projects in Saudi Arabia have been plagued by enormous overruns and delays over the previous three decades due to poor construction performance. The purpose of the research is determining the most critical factors affecting the accuracy of Saudi Arabian public project construction cost estimates. A questionnaire survey was given to 100 participants at random,95 of whom were males and 5 of whom were women, in order to acquire data. Cost estimates for Saudi public building projects are affected by financial concerns, the bidding situation and project features, as well as the estimation technique. The results found that the main factor related to financial issues. And the most significant factors of financial issues, which affecting cost estimates are financial status of client market, the unstable economic situation, cost estimation accuracy, financial resource availability, punctuality of cost flow as well as the availability of high-quality financial plans and accurate estimation. Besides, the most significant factors of bidding situation, which affecting cost estimates are designer and design quality, com-pany's strength and reputation in the construction industry, and amount of experience on such projects. Furthermore, the most significant factors of project characteristics, which affecting cost estimates are project manager competence, owners' requirement, Project specification and requirement, as well as project duration. Finally, the most significant factors of estimating process, which affecting cost estimates are project team's experience, time allowed for preparing estimates and availability of cost indices.\",\"PeriodicalId\":267155,\"journal\":{\"name\":\"Fayoum University Journal of Engineering\",\"volume\":\"78 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Fayoum University Journal of Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.21608/fuje.2022.168316.1027\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Fayoum University Journal of Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21608/fuje.2022.168316.1027","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

一个建设项目的成功取决于它的规划,准确的成本估算对公共和私营企业都至关重要。在过去的三十年里,由于施工性能不佳,沙特阿拉伯的公共建筑项目一直受到巨大超支和延误的困扰。研究的目的是确定影响沙特阿拉伯公共项目建设成本估算准确性的最关键因素。随机对100名参与者进行问卷调查,其中男性95人,女性5人,以获取数据。沙特公共建筑项目的成本估算受到财务问题、招标情况和项目特点以及估算技术的影响。结果发现,主要因素与财务问题有关。而影响成本估算的财务问题中最重要的因素是客户市场的财务状况、不稳定的经济形势、成本估算的准确性、财务资源的可用性、成本流动的及时性以及是否有高质量的财务计划和准确的估算。此外,影响造价估算的投标情况最重要的因素是设计师和设计质量,公司在建筑行业的实力和声誉,以及此类项目的经验。此外,影响成本估算的项目特征最显著的因素是项目经理能力、业主要求、项目规范和要求以及项目持续时间。最后,估算过程中影响成本估算的最重要因素是项目团队的经验、用于准备估算的时间以及成本指数的可用性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Factors Affecting Construction Projects’ Cost Estimating.
A construction project's success depends on its planning, accurate cost estimating is critical in both public and private enterprises. Public building projects in Saudi Arabia have been plagued by enormous overruns and delays over the previous three decades due to poor construction performance. The purpose of the research is determining the most critical factors affecting the accuracy of Saudi Arabian public project construction cost estimates. A questionnaire survey was given to 100 participants at random,95 of whom were males and 5 of whom were women, in order to acquire data. Cost estimates for Saudi public building projects are affected by financial concerns, the bidding situation and project features, as well as the estimation technique. The results found that the main factor related to financial issues. And the most significant factors of financial issues, which affecting cost estimates are financial status of client market, the unstable economic situation, cost estimation accuracy, financial resource availability, punctuality of cost flow as well as the availability of high-quality financial plans and accurate estimation. Besides, the most significant factors of bidding situation, which affecting cost estimates are designer and design quality, com-pany's strength and reputation in the construction industry, and amount of experience on such projects. Furthermore, the most significant factors of project characteristics, which affecting cost estimates are project manager competence, owners' requirement, Project specification and requirement, as well as project duration. Finally, the most significant factors of estimating process, which affecting cost estimates are project team's experience, time allowed for preparing estimates and availability of cost indices.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Comprehensive Study of Soil Subgrade Reaction Using Different Constitutive Soil Models Green Energy Applications in Potential Green Communities (Egypt2030) Actual Time wireless Communication Application for Microcomputer System Based on Data Acquisition Performance Evaluation of Scheduling Algorithms of LTE and LTE-A Mobile Networks using Vienna Simulator The MOX Fuel Performance Analysis of ALFRED Core Using MCNPX Transport Code
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1